My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-045
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 2:26:01 PM
Creation date
4/10/2025 2:18:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/25/2025
Control Number
2025-045
Agenda Item Number
9.B.
Entity Name
Donadio and Associates Architects, PA,
a Spiezle Group Inc. Company
Subject
Architects, PA, a Spiezle Group Inc. Company First Amendment to Agreement for
Phase II Design Service for Emergency Operations Center, Expansion; RFQ 2022062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 14, 2025 <br />Mr. Anthony Donadio AIA, NCARB <br />Principal <br />Donadio & Associates Architects, PA <br />A Spiezle Group Inc. Company <br />2001 9th Avenue, Suite 308 <br />Vero Beach, FL 32960 <br />6 • • <br />000'0: <br />CMTA <br />A L=_❑_nr-= <br />RE: Professional Services Fee Proposal — Additional Service Request <br />MEP/FP Design Engineering Services for Future Second Floor <br />Vero Beach, FL <br />Dear Tony: <br />CMTA is pleased to present our additional service fee proposal for the above -referenced project. Following <br />is a scope of work and compensation for the project. If the proposal is acceptable, please sign and return a <br />copy for our files. <br />Project Description: <br />Provide engineering services to calculate and increase the required loads and equipment for the future <br />second floor. This floor may be added after construction. This proposal only covers the required changes <br />to the 15` floor systems that will be required to be upsized or present during construction of the first floor <br />and not any design of the completed second floor. <br />Scope of Work: <br />Our basic scope of work will be as follows: <br />Mechanical Engineering <br />• Calculate the required tonnage for the future second floor to be used to calculate the electrical <br />service upgrade and provide space in exterior equipment yard. <br />Electrical Engineering <br />• Design for Electrical Distribution system on first floor to add second floor panels in future. <br />• Design for generator upgrade for second floor power. <br />Plumbing Engineering <br />• Design Engineering for Domestic Water Supply, Hot Water Source and Sanitary Sewer feeds to be <br />used for future second floor. <br />Fire Protection Design <br />181 Melody Lane Suite 107, Fort Pierce, FL 349501 561-466-1165 1 cmta.com Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.