Laserfiche WebLink
C MTA <br />�=csn�s <br />• Design Engineering for Fire Sprinkler System riser upgrade for additional flow to future second floor. <br />Scope of Services: <br />Our Scope of Work and Services will include the following: <br />1. Design Team Meetings <br />2. MEP/FP Specifications and Construction Documents (Revit (BIM) or AutoCAD). <br />3. Design Documents, Reviews and Responses for: <br />• Schematic Design <br />• Design Development <br />• Construction Documents <br />• Permitting <br />• Bid Assistance <br />• Construction Administration Services include Processing and Responding to Contractor RFI's, <br />Shop Drawing Review and if necessary, up to 3 (2 man) Site Visits for Observation of Work <br />and a Final Punch list (if required). <br />Additional Site Visits will on►y be performed upon request and receipt of an authorization to <br />proceed / acceptance fee of $750 per engineer, per visit. <br />Compensation for Services: <br />Our design fee for this additional service will be Nine Thousand Five Hundred Dollars ($9,500.00), with <br />customary reimbursable expenses estimated to be $250.00 (Expenses to be billed at Direct Cost). <br />Services required beyond basic scope shall be negotiated on an as needed basis at which time a proposal <br />for additional services will be provided. <br />If you find this proposal acceptable, please return to us one signed copy so we can schedule this project. <br />Should you have any questions, please do not hesitate to give us a call. <br />Accepted by: <br />James Burchard, Partner, Senior Project Manager <br />CMTA <br />james.burchard@cmta.com <br />772-519-1573 <br />Cc: Randy Stewart <br />Accepted by: <br />Spiezle Group Inc. <br />Signature <br />Name (Print) <br />Date <br />Page 2 of 2 <br />