a. Southbound right -turn on 43rd Avenue SW at 21st Street SW <br />b. Northbound left -turn lane on 43rd Avenue SW at 21 st Street SW <br />c. Eastbound left -turn lane on 21 st Street SW at 43rd Avenue SW <br />d. Westbound left -turn lane on 21 st Street SW to serve south project entrance <br />e. Westbound right -turn lane on 21st Street SW to serve north project entrance <br />f. Dual egress lanes at both of the project entrances on 21st Street SW <br />g. $25,000.00 applicant's contribution for future traffic signal at 21 st Street SW and 43rd Avenue SW <br />The final design of the required road paving, turn lane, and egress lane improvements cited above will <br />be reviewed via the project's LDP. Prior to issuance of an LDP, the applicant will need to submit <br />$25,000.00 to the County for future signalization. <br />Also, project traffic will impact the 43`d Avenue / SR 60 intersection, and the applicant will need to <br />contribute their fair share of the cost of funding improvements for that intersection. It is noted that the <br />43`d Avenue / SR 60 intersection improvements are currently being constructed. However, the applicant <br />is responsible to contribute, based on the previous conceptual PD plan and special exception approval. <br />Prior to issuance of an LDP, the applicant must enter into a developer's agreement for contributing <br />toward the 43`d Avenue / SR 60 intersection improvements. <br />11. Right -of -Way (ROW) Dedications: The project has frontage on three thoroughfare plan roads. These <br />are 25' Street SW, 21" Street SW, and 43`d Avenue SW. <br />a. 25' Street SW. In accordance with Public Works requirements, the applicant will dedicate, without <br />compensation, 80' of ROW for 25th Street SW. This 80' ROW dedication will be north of the <br />existing IRFWCD canal ROW, and will achieve the required ROW width for this section of 25th <br />Street SW. Prior to issuance of an LDP, the applicant must complete the required 25th Street ROW <br />dedication. <br />b 21S" Street SW: The applicant will dedicate, without compensation, 80' of ROW for 21St Street <br />SW. This 80' ROW dedication will be north of the existing IRFWCD canal ROW, and will achieve <br />the required ROW width for this section of 21" Street SW. Prior to issuance of an LDP, the <br />applicant must complete the required 21St Street ROW dedication. <br />c. 43rd Avenue SW.• The Thoroughfare Plan classifies 431 Avenue SW as a collector roadway <br />requiring 100' of ultimate ROW. Presently, 50' of right-of-way exists for this segment of 43`d <br />Avenue SW. An IRFWCD lateral canal lies on the east side of 43`d Avenue SW. Therefore, all <br />additional 43`d Avenue SW ROW must come from the subject site which is located on the west side <br />of 43`d Avenue Sw. Prior to issuance of an LDP, the applicant must complete the required 43`d <br />Avenue SW ROW dedication. <br />12. Required Improvements: <br />a. 25`" Street SW: The applicant will pave 25th Street SW from 43`d Avenue SW to the west project <br />boundary as a two-lane facility. Improvements to 25' Street SW are considered required <br />subdivision improvements and will be the applicant's responsibility. These improvements must be <br />completed prior to issuance of a certificate of completion (C. of C.) for Phase 1 of the project. <br />FACommunity Development\CurDcv\P&Z\2022UAcside West Preliminary PD - PD -21-11-10 (90748).docx <br />