Laserfiche WebLink
b. 21" Street SW.• The applicant will pave 21" Street SW from 43rd Avenue SW to the west project <br />boundary as a two lane road with turn lanes at the project's 21s' Street SW entrances. These <br />improvements will also be the applicant's responsibility as required subdivision improvements and <br />must be completed prior to issuance of a C. of C. for Phase 1 of the project. <br />c. Perimeter Buffers: The preliminary PD plan provides for landscaped berms, landscaped <br />corner/intersection common green areas, and screening of the lift station proposed near the <br />project's south entrance on 211 Street SW. Per the previous conceptual PD plan and special <br />exception approval, a 25' Type `B" buffer with 7' opaque feature is required along all project <br />perimeters, and along the north and south side of 21' Street SW. Planning staff approval of the <br />final landscape plans will be required prior to issuance of an LDP. All required landscape <br />improvements must be installed, inspected, and accepted prior to the issuance of a C. of C. for each <br />respective project phase. <br />d. External Sidewalks: A 5' wide sidewalk will be provided along the north side of 25d' Street SW. <br />An 8' sidewalk will be provided along the west side of 43' Avenue SW and along the south side of <br />21St Street SW from 43rd Avenue to the west site boundary. These sidewalks will be provided as <br />part of the required roadway improvements, and must be completed prior to issuance of a C. of C. <br />for Phase 1 of the project. <br />e. Internal Sidewalks: 5' wide internal sidewalks will be provided throughout the project on both <br />sides of all internal streets. This internal sidewalk system will also connect to the external <br />sidewalks system along 25" Street SW, 21St Street SW, and 43' Avenue SW. All sidewalks will be <br />included in the project's LDP, and will need to be constructed along the frontage of common areas <br />and individual lots in accordance with the requirements of subdivision ordinance section <br />913.09(5)(b)2. <br />f. Streetlighting: Streetlights are required and proposed, and will be maintained by the property <br />owners' association. The proposed streetlight locations are depicted on the preliminary PD <br />plan/plat. The final design of the streetlights will be reviewed via the LDP each respective project <br />phase. The project's streetlights must be installed, inspected, and accepted prior to the issuance of a <br />C. of C. for each respective project phase. <br />13. Environmental and Tree Protection Issues: The site is former grove and pastureland with no <br />jurisdictional wetlands or native uplands. There are Australian Pine and Brazilian Pepper trees on site, <br />and those will be removed during site construction. Throughout the project site located south of 21St <br />Street SW, there are 26 large oak trees that will be relocated to various common green spaces on the <br />overall project site. The preliminary PD plan designates oak tree "receiver sites" near perimeter public <br />street intersections, at project entrances, and on internal park tracts. Prior to issuance of an LDP, the <br />applicant shall obtain Environment Planning staff approval of a tree relocation plan. The applicant must <br />relocate the selected trees prior to the issuance of a C. of C. for each respective project phase. <br />14. PD Approval Conditions: This PD project is approved with various conditions pertaining to <br />improvements, dedications, and contributions. These conditions are reflected in staff's <br />recommendation. <br />FACommunity Development\CurDev\P&Z\2022\ akeside West Preliminary PD - PD -21-11-10 (90748).doex 4 <br />