My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-073
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 3:31:49 PM
Creation date
4/14/2025 3:03:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Developer's Agreement
Approved Date
03/25/2025
Control Number
2025-073
Agenda Item Number
11.a.1.
Entity Name
Meritage Homes of Florida, Inc.
Subject
Developer’s Agreement for Fair Share Roadway Improvement Contribution,
Right of Way Dedications and Associated Roadway and Drainage Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. South County Initiative (SCI): At the May 4, 2004 BCC meeting, Planning staff presented the SCI, <br />which consisted of a total of seven development projects located in the south County area, including <br />the subject project site (Tripson Trail). The BCC expressed support for the SCI, and the associated <br />planning principals, as follows: <br />• Mixing building types and uses; <br />• Clustering development in compact areas; <br />• Providing pedestrian connections between uses and projects; <br />• Establishing a grid or modified grid street network; <br />• Siting school and community park areas; <br />• Siting a neighborhood commercial site within the SCI area. <br />Based on the project's previous conceptual PD plan and special exception approval, the project is <br />required to participate in the SCI, and those participation requirements are included in staff's <br />recommendation. <br />16. Concurrency: As required under the County's concurrency regulations, the applicant has applied for <br />and obtained a conditional concurrency certificate for the project, which is sufficient for preliminary <br />PD plan/plat approval. The concurrency certificate was issued based upon a concurrency analysis and a <br />determination that adequate capacity was available to serve the subject project at the time of the <br />determination. The applicant will, in accordance with County concurrency regulations, be required to <br />obtain a final concurrency approval prior to issuance of a building permit for each residential unit. <br />It should be noted that the previous applicant pre -paid the project's required traffic impact fees, and <br />obtained a 5 -year concurrency certificate. That 5 -year concurrency certificate ultimately expired. <br />However, the pre -paid traffic impact fee credits run with the land, and do not expire. Therefore, the <br />traffic impact fee credits will be applied to the traffic impact fee obligation for each new unit, on a unit <br />by unit basis. <br />17. Surrounding Land Use and Zoning: <br />North: Former grove, tree farm, grove service / A-1 <br />East: 43rd Avenue SW, drainage canal, single-family homes, vacant / RS -3 <br />South: 25th Street SW, drainage canal / St. Lucie County <br />West: Former grove, single-family homes / A-1 <br />All conditions recommended by staff have been accepted by the applicant. <br />RECOMIIIENDATION: <br />Staff recommends that the Planning and Zoning Commission grant preliminary PD plan approval for <br />Lakeside West with the following conditions: <br />1. Prior to issuance of a land development permit, the applicant shall: <br />FACommunity Development\CurDev\P&Z\2022\Lakeside West Preliminary PD - PD -21-11-10 (90748).docx 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.