My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-042
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:06:56 AM
Creation date
4/15/2025 11:05:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/11/2025
Control Number
2025-042
Agenda Item Number
9.Y.
Entity Name
Lawrence Lee Construction Services, Inc
Subject
. Agreement for West Regional Wastewater Treatment Facility Clarifiers No. 1 and 2 Improvements;
RFP 2025006
Area
8405 8th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP 2025006 - West Regional WWTF Clarifiers 1 and 2 Cost Proposal Form - Addendum 1 <br />Table A-2 is for each Proposer's base proposal. Costs other than those listed should be included as miscellaneous line items provided in the price <br />form. Proposers will attach additional sheets if needed. <br />Table A-2: Proposer's Base Cost <br />ITEM <br />I DESCRIPTION <br />UNIT <br />UNIT PRICE <br /># <br />TOTAL <br />A. General Conditions <br />1 <br />Bonds and Insurance <br />LS <br />$95,000.00 <br />1 <br />$95,000.00 <br />2 <br />Mobilization and demobilization <br />LS <br />$95,000.00 <br />1 <br />$95,000.00 <br />3 <br />Temporary Facilities <br />LS <br />$50,000.00 <br />1 <br />$50,000.00 <br />4 <br />Progress documentation (Appendix B) <br />LS <br />$1,000.00 <br />1 <br />$1,000.00 <br />5 <br />Shop drawing submittals <br />LS <br />$75,000.00 <br />1 <br />$75,000.00 <br />6 <br />Record drawings <br />LS <br />$2,000.00 <br />1 <br />$2,000.00 <br />7 <br />Closeout and site restoration as required <br />LS <br />$1,000.00 <br />1 1 <br />$1,000.00 <br />Subtotal A <br />$319,000.00 <br />B. Equipment Procurement <br />1 <br />WPE Quote <br />LS <br />$724,116.00 <br />1 <br />$724,116.00 <br />2 <br />Federal, State, and local taxes or fees <br />LS <br />$32,054.00 <br />1 <br />$32,054.00 <br />3 <br />Proposer's add-on, including contingencies <br />LS <br />$277,514.00 <br />1 <br />$277,514.00 <br />4 <br />Receiving and temporary storage <br />LS <br />$20,000.00 <br />1 <br />$20,000.00 <br />Subtotal B <br />$1,053,684.00 <br />C. Demolition <br />1 <br />Pipe and conduit removal <br />LS <br />$50,000.00 <br />1 <br />$50,000.00 <br />2 <br />Recovery and temporary storage of items slated for reuse <br />LS <br />$100,000.00 <br />1 <br />$100,000.00 <br />3 <br />Removal and approved disposal remaining equipment <br />LS <br />$180,000.00 <br />1 <br />$180,000.00 <br />Subtotal C <br />$330,000.00 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.