My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-021
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 9:48:14 AM
Creation date
4/21/2025 9:47:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/28/2025
Control Number
2025-021
Agenda Item Number
16.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order 7 for Annual Permit, Compliance Monitoring and Reporting for 2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />20 December 2024 <br />Page 9 <br />Phase 4 — Storage Tank Monitoring Well Sampling and Reporting <br />In accordance with Table 2 of the Order, Geosyntec will assist the SWDD with quarterly <br />monitoring of well associated with the leachate storage tank, analytical testing by Eurofins under <br />direct contract to the SWDD, and preparation of the 2025 annual summary report for submittal to <br />the FDEP. <br />Phase 5 — Prepare July 2023 — December 2025 Technical Report <br />Geosyntec will prepare the Technical Report for the Class I landfill and C&D debris disposal <br />facility. The report will summarize and interpret water quality data and water level <br />measurements collected over the last two and one-half (2.5) years of operation and covering five <br />(5) semi-annual reporting events from July 2023 through December 2025. The Technical Report <br />will comply with the requirements of the Facilities WQMPs, and will address the following: <br />• tabular and graphical display of the data that show a monitoring parameter has been <br />detected, including hydrographs for all monitoring wells; <br />• trend analysis for detected parameters; <br />• comparison among shallow, intermediate and deep zones; <br />• comparison between up -gradient and down gradient monitoring wells; <br />• correlation between related parameters; <br />• discussion of erratic and/or poorly correlated data; <br />• an interpretation of groundwater contour maps; and <br />• an evaluation of the adequacy of the monitoring plan. <br />Geosyntec will submit the report to the FDEP by 31 January 2026. <br />Phase 6 — Title V Permit Compliance and Reporting <br />Geosyntec will assist the SWDD in complying with the operation, monitoring, and reporting <br />requirements for of the active landfill gas collection and control system (GCCS) under the <br />current Title V Air Operation Permit No. 0610015 -008 -AV. The following permit compliance <br />support services will be provided: <br />• Annual Statement of Compliance: Geosyntec will prepare and submit the annual <br />Statement of Compliance for the Class I Landfill. This compliance document must be <br />submitted to the FDEP within 60 days after the end of the calendar year, as required by <br />subparagraph 62-213.440(3)(a)(2), F.A.C. <br />NCP2323548/1L23073_2025 Compliance Monitoring Proposal <br />cnl;inocrs I -�civntist, I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.