My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-021
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 9:48:14 AM
Creation date
4/21/2025 9:47:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/28/2025
Control Number
2025-021
Agenda Item Number
16.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order 7 for Annual Permit, Compliance Monitoring and Reporting for 2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />20 December 2024 <br />Page 8 <br />sealed by a Florida registered professional engineer. These reports will be submitted to the <br />SWDD for review prior to submittal to the FDEP. The reports (in Adobe format) and analytical <br />data Electronic Data Deliverable (EDD) will be submitted electronically to the FDEP using the <br />ADaPT software in accordance with Section V.E of the WQMP. According to the WQMP, <br />monitoring test results shall be submitted to the FDEP within 60 days from completion of <br />laboratory analyses. <br />Phase 3 Quarterly Assessment Monitoring and Reporting (Both C&D Debris Disposal <br />Facility and Class I Landfill) <br />Geosyntec will perform quarterly sampling events for Calendar Year 2025 (January, April, July, <br />and October) of five (5) groundwater wells (MW -21 S, MW -495, MW -505, MW -51 S, and MW - <br />52S) and four (4) surface water sample sites (SW -LCI, SW-LC3, LC-SW4, and LC-SW6) for <br />the C&D debris disposal facility and at seven (7) groundwater monitoring wells (MW -3S, MW - <br />145, MW -44S, MW -44I, MW -535, MW -54S, and MW -54I) and four (4) surface water samples <br />(C5 -SWI, SW -MW -145, SW -MW -53S, and SW -MW -54S) for the Class I landfill. <br />The January and July sampling will be performed as part of the semi-annual sampling program <br />under Phase 2 for the C&D debris disposal facility and assumed to take three (3) additional days <br />to complete. The April and October data collection and sampling will each take four (4) days to <br />complete. Geosyntec will deliver the samples to Eurofins laboratory for analytical testing under <br />the SWDD's contract (i.e., Eurofins will directly invoice the SWDD for laboratory charges). <br />For the C&D debris disposal facility, the quarterly assessment monitoring samples (including <br />those collected in January and July) will be analyzed for the routine monitoring parameters listed <br />in Paragraph 8 of the WQMP (C&D Permit) plus arsenic and benzene. <br />For the Class I landfill, the quarterly assessment groundwater monitoring samples will be <br />sampled for parameters as required by subparagraph 62-701.510(6)(a)3, F.A.C. The surface <br />water samples will be screened for field parameters. <br />Geosyntec will assist the SWDD in coordinating the analytical testing activities with Eurofins, <br />notify the FDEP prior to sampling as required by the WQMP, review and evaluate the analytical <br />test results, and prepare a letter report for each quarterly assessment monitoring event. <br />The reports will be submitted in draft forms to the SWDD for review and comment and will be <br />finalized, with the SWDD's comments implemented, for submittal to the FDEP. Any changes to <br />the monitoring and reporting requirements that might be requested by the FDEP based on the <br />results of the quarterly assessment monitoring will be performed under Phase 7 below. <br />NCP2323548/JL23073 2025 Compliance Monitoring Proposal <br />rn"'invert I scicntin. I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.