Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />20 December 2024 <br />Page 7 <br />and attendance (by two Geosyntec personnel) at one meeting with the SWDD and/or FDEP, as <br />needed. <br />Phase 2 Semi Annual Sampling and Reporting (Both C&D Debris Disposal Facility and <br />Class I Landfill) <br />Geosyntec will assist the SWDD to perform the semi-annual sampling and prepare the water - <br />quality monitoring reports as required by the WQMP. Geosyntec will assist the SWDD with <br />conducting all field sampling preparation activities, including scheduling, staffing, <br />subcontracting, and field equipment preparation. Prior to collecting the groundwater samples in <br />January and July 2025, Geosyntec will perform water -level measurements from the Site <br />monitoring well network and installed staff gauges adjacent to the Site. Geosyntec will then <br />perform semi-annual sampling of the Class I landfill and C&D debris disposal facility <br />groundwater monitoring wells in January (34 wells) and July (25 wells) of 2025. We will also <br />perform semi-annual (January and July) sampling of the surface water site (SW -2) if it is <br />discharging from the stormwater pond. <br />It is estimated that data collection and sampling will take five (5) full days in January and four <br />(4) full days in July for the semi-annual monitoring and reporting for the Class I landfill and <br />C&D debris disposal facility. Geosyntec will deliver the samples to Eurofins laboratory for <br />analytical testing under the SWDD's contract (i.e., Eurofins laboratory will directly invoice the <br />SWDD). <br />The laboratory analytical testing will be conducted by Eurofins testing laboratory. The samples <br />collected from the Class I landfill monitoring wells will be analyzed for the routine monitoring <br />parameters listed in paragraph 7 of the WQMP and in accordance with paragraph 62- <br />701.510(5)(c) & (7)(a), F.A.C. The samples collected from the C&D debris disposal facility <br />monitoring wells, with the exception of the quarterly assessment wells, will be analyzed for the <br />routine monitoring parameters listed in paragraph 8 of the WQMP and in accordance with 62- <br />701.739(8)(d), F.A.C. The samples from the surface water site (SW -2) will be analyzed for the <br />list of parameters listed in Section I1I.2 of the Class 1 Landfill WQMP, as required by paragraphs <br />62-701.510 (5)(d) and (7)(b), F.A.C. Geosyntec will assist the SWDD in coordinating the <br />analytical testing activities with Eurofins, notify the FDEP prior to sampling as required by the <br />WQMP, review and evaluate the analytical test results, and prepare the semi-annual reports. <br />The results of water -quality sampling under the WQMP will be presented in a report supported <br />by attachments containing chain -of -custody sheets, field notes and observations, water sampling <br />logs, maps, analytical results, and any other applicable materials. The reports will include <br />groundwater completion report form and groundwater elevation contour map, both signed and <br />NCP2323548/JL23073 2025 Compliance Monitoring Proposal <br />ongincers I sciewists I innw:nors <br />