Laserfiche WebLink
JLA Geosciences, Inc. <br />Proposal to Gustavo Vergara, CPRE <br />December 11, 2024 <br />Page 2 of 3 <br />• JLA will develop a well construction sequence and design criteria for one (1) replacement <br />UFA supply well to generate pricing. Design and pricing will be based off of the Town of <br />Jupiter (TOJ) Well Rehabilitation and Maintenance contract that has been Piggybacked <br />by IRC to complete this work. <br />2.0 Construction Phase Services — Provide hydrogeologic observation services, hydrogeologic <br />direction and well design/construction implementation during construction of one (1) <br />replacement UFA heat exchange system supply well at the IRC NCAC. <br />• A JLA hydrogeologist will be present at the well site during critical phases of well <br />construction including: pilot hole drilling, geophysical logging, casing installation and <br />cement grouting, completion interval drilling, flow and water quality testing, well <br />development, and pump testing. JLA will observe and log drilling and collect lithologic <br />samples during drilling. <br />• JLA will provide recommendations for the constructed depths of bore holes and casing, <br />and will direct step drawdown testing, perform water level measurements and well <br />specific capacity analysis. This task will include providing the client with typed geologist's <br />lithologic logs, water quality field data summaries, and copies of the geophysical logs. <br />The proposed budget is based on a 60 -day construction schedule for the contractor to <br />complete drilling development and testing of the well. The estimate of labor hours is <br />based on the attached summary. <br />• JLA will prepare a well tech memo report to be submitted electronically summarizing <br />construction and testing of the UFA supply well including figures, data tables, <br />geophysical logs, pump test data, field water quality data, lithologic logs, geologic <br />interpretations and recommendations. <br />Outlined below are the specific tasks included in our proposed scope of work, along with the <br />associated costs for your thorough review and consideration. <br />TASK <br />COST <br />1.0- UFA WELL SITING AND DESIGN <br />$8,830.00 <br />2.0- UFA WELL CONSTRUCTION OVERSIGHT AND REPORTING <br />$29,575.00 <br />PROJECT TOTAL <br />$38,405.00 <br />Schedule <br />JLA understands the importance of expediting this evaluation. As such, following authorization, JLA <br />will begin immediately with the well siting and design to facilitate the start of well construction. Task <br />1 well siting and design will be provided within 30 days of authorization. Task 2 well construction <br />schedule will depend on Contractors crew and equipment availability. <br />jlageosciences.com <br />170 <br />