Laserfiche WebLink
JLA Geosciences, Inc. <br />Proposal to Gustavo Vergara, CPRE <br />December 11, 2024 <br />Page 3 of 3 <br />Assumptions <br />• Existing Town of Jupiter Wellfield Rehabilitation and Maintenance contract with <br />Centerline Drilling will be piggybacked by the IRC to perform the proposed well <br />construction work. <br />• JLA will provide up to 140 hours of onsite hydrogeological services for the new <br />replacement well assuming a 60 -day construction schedule to fully complete drilling, <br />testing, development and construction. <br />• Permitting costs if required are not included in this scope of work. <br />• Certifications by a State of Florida Professional Engineer if required are not included in <br />this scope of work. <br />This proposal has been carefully prepared using the information provided and our understanding of <br />the project. If there are any additional details or specific requirements that we may have <br />inadvertently overlooked, we would be more than happy to review any additional information <br />provided. Our aim is to ensure that the scope of work and associated costs align with your <br />expectations and project goals. <br />Thank you once again for considering our services. We look forward to continuing our collaboration <br />with you on this project. <br />Sincerely, <br />JLA Geosciences, Inc. <br />Jon Friedrichs, P.G. <br />Principal Hydrogeologist <br />