Laserfiche WebLink
January 14, 2025 <br />Mr. Anthony Donadio AIA, NCARB <br />Principal <br />Donadio & Associates Architects, PA <br />A Spiezle Group Inc. Company <br />20019th Avenue, Suite 308 <br />Vero Beach, FL 32960 <br />RE: Professional Services Fee Proposal — Additional Service Request <br />MEP/FP Design Engineering Services for Future Second Floor <br />Vero Beach, FIL <br />Dear Tony: <br />CMTA <br />A L=CE17C= Company <br />CMTA is pleased to present our additional service fee proposal for the above -referenced project. Following <br />is a scope of work and compensation for the project. If the proposal is acceptable, please sign and return a <br />copy for our files. <br />Project Description: <br />Provide engineering services to calculate and increase the required loads and equipment for the future <br />second floor. This floor may be added after construction. This proposal only covers the required changes <br />to the Vt floor systems that will be required to be upsized or present during construction of the first floor <br />and not any design of the completed second floor. <br />Scope of Work: <br />Our basic scope of work will be as follows: <br />Mechanical Engineering <br />• Calculate the required tonnage for the future second floor to be used to calculate the electrical <br />service upgrade and provide space in exterior equipment yard. <br />Electrical Engineering <br />• Design for Electrical Distribution system on first floor to add second floor panels in future <br />• Design for generator upgrade for second floor power. <br />Plumbing Engineering <br />• Design Engineering for Domestic Water Supply, Hot Water Source and Sanitary Sewer feeds to be <br />used for future second floor. <br />Fire Protection Design <br />181 Melody Lane Suite 107, Fort Pierce, FL 349501 561-466-1165 1 cmta.com <br />Page 1 of 2 <br />20 <br />