My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/25/2025
CBCC
>
Meetings
>
2020's
>
2025
>
02/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2025 12:57:51 PM
Creation date
4/24/2025 12:13:29 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/25/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMTA <br />• Design Engineering for Fire Sprinkler System riser upgrade for additionaIf low to future second floor. <br />Scope of Services: <br />Our Scope of Work and Services will include the following: <br />1. Design Team Meetings <br />2. MEP/FP Specifications and Construction Documents (Revit (BIM) or AutoCAD). <br />3. Design Documents, Reviews and Responses for: <br />• Schematic Design <br />• Design Development <br />• Construction Documents <br />• Permitting <br />• Bid Assistance <br />• Construction Administration Services include Processing and Responding to Contractor RFI's, <br />Shop Drawing Review and if necessary, up to 3 (2 man) Site Visits for Observation of Work <br />and a Final Punch list (if required). <br />Additional Site Visits will only be performed upon request and receipt of an authorization to <br />proceed / acceptance fee of $750 per engineer, per visit. <br />Compensation for Services: <br />Our design fee for this additional service will be Nine Thousand Five Hundred Dollars ($9,500.00), with <br />customary reimbursable expenses estimated to be $250.00 (Expenses to be billed at Direct Cost). <br />Services required beyond basic scope shall be negotiated on an as needed basis at which time a proposal <br />for additional services will be provided. <br />If you find this proposal acceptable, please return to us one signed copy so we can schedule this project. <br />Should you have any questions, please do not hesitate to give us a call. <br />Accepted by: Accepted by: <br />Spiezle Group Inc. <br />James Burchard, Partner, Senior Project Manager Signature <br />CMTA <br />james.burchard@cmta.com 1 <br />772-519-1573 Name (Print) <br />Cc: Randy Stewart <br />Date <br />Page 2 of 2 <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.