My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/05/2022 (2)
CBCC
>
Meetings
>
2020's
>
2022
>
07/05/2022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:25:23 AM
Creation date
4/29/2025 10:17:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/05/2022
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00942 — CHANGE ORDER NO. 1 <br />DATE OF ISSUANCE: 7/05/2022 EFFECTIVE DATE: 7/05/2022 <br />OWNER: Indian River County <br />CONTRACTOR Don Hinkle Construction, Inc. <br />Project: Indian River County Tax Collector's Office Expansion <br />OWNER's Project No. IRC -2030 <br />OWNER'S Bid No. 2022018 <br />You are directed to make the following changes in the Contract Documents: <br />Interior renovations to the Human Resources Office at the County Administration <br />Complex Building "B" per plans by Edlund, Dritenbas, Binkley Architects and Associates, <br />P.A.. (EDB) <br />Reason for Change Order: <br />• Add the Human Resources Office remodel improvements to the Tax Collectors Office <br />Expansion Project. Don Hinkle Construction, Inc. to complete this work within the <br />contract time allowed for the Tax Collectors Office Expansion. <br />Items shall include all associated costs with completing the work listed and shown on drawings <br />as detailed within this change order including, but not limited to installation, all labor, <br />construction equipment and materials, and incidentals necessary to perform the work. This <br />Change Order shall be an addition to the existing contract, all existing contract provisions are to <br />remain in place. <br />Documents supporting: <br />Proposal from Don Hinkle Construction, Inc. dated 5-2-2022 <br />IRC Human Resources Interior Remodel design plans by EDB. Dated 5-5-2021 <br />IRC Human Resources Remodel Building "B" specifications by EDB. Dated 5-12-2021 <br />CHANGE IN CONTRACT PRICE: <br />Description <br />Amount <br />Original Contract Price <br />$523,062.36 <br />Net increase (decrease) <br />of this Change Order: <br />$91.157.40 <br />Contract Price with all <br />approved Change Orders: <br />$614.219.76 <br />ACCEPTED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />CHANGE IN CONTRACT TIMES <br />Description <br />Time <br />Original Contract Time: <br />(days or dates) <br />Substantial Completion: <br />120 (10-18-2022) <br />Final Completion: <br />150 11-17-2022 <br />Net increase this Change Order: <br />(days or dates) <br />Substantial Completion: <br />0 <br />Final Completion: <br />0 <br />Contract Time with all approved <br />Change Orders: <br />(days or dates) <br />Substantial Completion: <br />120 (10-18-2022) <br />Final Completion: <br />150 11-17-2022 <br />RECOMMENDED: <br />By: <br />PROJECT MANAGER <br />(Signature) <br />Date: <br />00942-1 <br />C:\Users\ufc-prod\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@0812043C\@BCL@0812043C.doc <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />@BCL@081204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.