My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-079
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 3:11:37 PM
Creation date
5/1/2025 3:10:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/08/2025
Control Number
2025-079
Agenda Item Number
9.J.
Entity Name
MBV Engineering, Inc.
Subject
Work Order No. 7 for Design of 43rd Ave Sidewalk Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 - Bidding Phase <br />The COUNTY shall be responsible for providing the front-end bid documents, bid opening date, <br />advertisement of the bid, scheduling the pre-bid meeting, and scheduling the bid opening. The <br />Consultant will provide the following: <br />• Preparation of civil plan documents for bidding <br />• Attendance at one (1) pre-bid meeting <br />• Responses to requests for additional information (RAIs) from bid meeting. A single set of RAI <br />comments shall be provided to CONSULTANT by COUNTY such that a reasonable timeframe is <br />provided that allows the CONSULTANT to address any comments properly. <br />NOTE: All construction specifications will be on the applicable Civil plan sheets in lieu of a specifications <br />manual. The Consultant will prepare a pdf file of the final bid package for the COUNTY's use in <br />distribution to prospective bidders via DemandStar and FDOT, if applicable. <br />Task 5 - Construction Phase <br />The Consultant shall provide the below services during the Construction Phase. Should additional <br />Construction Services be desired, CONSULTANT can provide COUNTY Amendment to the Work Order <br />for the desired additional services. <br />• Attendance at one (1) pre -construction meeting with COUNTY and selected contractor <br />• Shop drawings review of civil site components <br />• Coordination with COUNTY MPO and Public Work staff for RAIs during construction <br />• RAI coordination with selected contractor <br />• Work Change Directives — the Consultant may recommend changes to the COUNTY and will review <br />and make recommendations related to the RAIs or work change directives submitted or proposed <br />by OWNER or Contractor, and provide revised plans as requested. <br />• Eight (8) sidewalk pre -pour formboard inspections during construction phase <br />• One (1) pre -final inspection for punch list prior to final inspection <br />• One (1) Final Inspection with COUNTY for substantial completion confirmation <br />• Review of project as-builts provided to CONSULTANT by COUNTY <br />• Certification by E.O.R. to COUNTY upon project completion <br />Task 6 — Reimbursables <br />This task includes costs and expenses such as print costs, mileage, courier deliveries, and overnight <br />deliveries associated with the project. Permit application fees are not included in this Task and will be <br />paid directly by the Owner if applicable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.