Laserfiche WebLink
Task 2 — Constructability Phase (90%) <br />A. Construction Plans <br />The CONSULTANT will prepare 90% constructability drawings for the proposed improvements <br />to include the following: Cover Sheet, Existing Conditions Plan (Survey provided by COUNTY), <br />Demolition Plan, General Notes & Specifications Plan, Typical Section Plan, Site Plan, Grading <br />and Drainage Plan, Erosion Control Plan, Sidewalk Profiles Plan and applicable project details <br />sheets. <br />B. Swale Drainage Calculations <br />The CONSULTANT will prepare pre / post hydraulic calculations pursuant to the FDOT drainage <br />manual to determine the headloss due to the swale changes and to properly size any new <br />culverts. <br />C. County Review & Plan Revisions <br />The CONSULTANT will attend one (1) progress review meeting with COUNTY staff to review the <br />90% constructability plans. A single set of review comments shall be provided to CONSULTANT <br />prior to, during or after the review meeting, as applicable. This task includes one revision to <br />plans from the COUNTY review within reasonable scope of the project. <br />D. FDOT Review & Plan Revisions <br />The CONSULTANT will attend one (1) virtual (Teams/Zoom) progress review meeting with FDOT <br />staff to review the 90% design plans. A single set of review comments shall be provided to <br />CONSULTANT prior to, during or after the review meeting, as applicable. This task includes <br />revisions to plans from the FDOT review within reasonable scope of the project. <br />E. Engineer's Estimate <br />The CONSULTANT will produce an Engineer's Estimate for the 100% design plans. The cost <br />estimate shall be prepared utilizing the FDOT Engineers Estimate form. It is directed by FDOT <br />that though the constructability phase represents 90% design plans, the Engineer's Estimate for <br />this phase shall be based on the 100% milestone. <br />Task 3 — Agency Submittals (Production Phase) <br />A. Final Construction Plans <br />The CONSULTANT will prepare the final (100%) Signed and Sealed Construction documents and <br />transmit to COUNTY for Agency submittal. <br />B. Final Engineer's Estimate <br />The CONSULTANT will prepare the final Signed and Sealed Engineer's Estimate and transmit to <br />COUNTY for Agency submittal. <br />C. County Submittal Coordination <br />The CONSULTANT will assist COUNTY with the Civil portion of deliverables during this phase. <br />This task may include coordination calls, meetings or virtual meetings to assist with the <br />development of the final transmittal documents. COUNTY will be responsible for developing <br />and transmitting the full Agency submittal package (with all other documents completed by <br />others) to FDOT. <br />