My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-102
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 10:35:20 AM
Creation date
6/2/2025 10:34:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/06/2025
Control Number
2025-102
Agenda Item Number
9.N.
Entity Name
Atkins North America, Inc.
Subject
Engineering Services Work Order 09 for Central Wastewater Treatment Facility Odor Control Project
Project Number
IRCDUS Proj. ID: 22.22.513
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 25"', 2025 <br />Ms. Yvonne Picard, PE <br />ATKINS North America, Inc. <br />482 South Keller Road <br />Orlando, FL 32810-6101 <br />E4:/ C � A' <br />,11W W M_-• <br />Re: Indian River Central WWTF Sludge Tank Odor Control Facility <br />Additional Engineering Services <br />Vero Beach, Florida <br />Dear Ms. Picard: <br />We are pleased to submit our proposal for additional electrical and instrumentation <br />engineering services for the above project. The following provides an overview of the <br />engineering services Bailey Engineering Consultants, Inc. (BEC) intends to furnish to <br />Atkins. Our work scope shall include the following: <br />Task 01 - Project Management <br />1. Meet on site to discuss and identify the additional services requested by Atkins <br />and Indian River County (IRC). <br />2. Attend 2 additional Teams meetings to review the project progress with Atkins <br />and IRC. <br />Task 02 - Pre -Bid Preparation <br />2.1 Construction Document Updates / Final Design <br />1. Task 1 — Additional Base Bid Work <br />a. Provide remote 1/0 panels in the sludge building area and main electrical <br />room. <br />b. Pick up 1/0 for rotary drum thickeners, Plant Lift Station, polymer system and <br />sludge feed flow meter.flow meter replacement 8" flowmeter. <br />2. Task 2 <br />a. Replace Main Breaker in sludge thickening building (800 amps) <br />b. Replace site lighting with LED fixtures. <br />c. Provide new lighting in sludge building electrical room. <br />d. Re feed power in thickener area, Lift station control panel, air compressors <br />and sludge pumps. <br />e. Provide 120V feeds for polymer system and future flowmeter. <br />10620 GRIEEIN ROAD, SUITE 202 • COOPER CITT, FFG • 33328 <br />POONE: 954-448-7930 • TAX: 954-713-9959 <br />
The URL can be used to link to this page
Your browser does not support the video tag.