My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-102
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 10:35:20 AM
Creation date
6/2/2025 10:34:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/06/2025
Control Number
2025-102
Agenda Item Number
9.N.
Entity Name
Atkins North America, Inc.
Subject
Engineering Services Work Order 09 for Central Wastewater Treatment Facility Odor Control Project
Project Number
IRCDUS Proj. ID: 22.22.513
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Yvonne Picard, PE Page 2 March 25th, 2025 <br />3. Task 3 <br />a. Provide new VFDs for reuse water pumps. No.1 and No.2. VFD's to be <br />mounted next to existing double doors. <br />b. Add a FPP next to RIO to connect RIO -1 and RIO -2 to PLC -2A. <br />4. Deliverables: <br />a. 90% Submittal. BEC shall submit electronic copies of the plans (in AutoCAD <br />format and PDF), specifications (in MS Word and PDF) and cost opinion (in <br />PDF) to Atkins. Additional reproduction by others. <br />b. 100% Submittal. BEC shall submit electronic copies of the plans (in AutoCAD <br />format and PDF), specifications (in MS Word and PDF) and cost opinion (in <br />PDF) to Atkins. Additional reproduction by others. <br />2.2 Construction Document Review Workshop and Bid Documents <br />1. Attend one (1) meeting as requested to review status and design requirements. <br />2.3 FDEP Permit <br />1. BEC shall assist during the permitting process and answer questions resulting <br />from building department review. <br />Task 03 - Bid Support Services <br />3.1 Pre -Bid Meeting <br />1. Attend Pre -Bid meeting. <br />3.2 RFI/Addendum <br />1. BEC will respond to questions from bidders as related to this project and prepare <br />any necessary addenda. <br />3.3 Recommendation of Award <br />1. Review the bid submittals and make a recommendation as related to electrical <br />and I&C. <br />Task 04 - Construction Phase Services <br />1. BEC will provide construction phase services for up to eighteen months following <br />the notice of award. Construction phase services will include the tasks as defined <br />below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.