My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-102
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 10:35:20 AM
Creation date
6/2/2025 10:34:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/06/2025
Control Number
2025-102
Agenda Item Number
9.N.
Entity Name
Atkins North America, Inc.
Subject
Engineering Services Work Order 09 for Central Wastewater Treatment Facility Odor Control Project
Project Number
IRCDUS Proj. ID: 22.22.513
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Yvonne Picard, PE Page 4 March 25th, 2025 <br />provide one (1) set of electronic construction record drawings and electronic files <br />of the record drawings in AutoCAD 2019 format. <br />SUPPLEMENTAL SERVICES - Any work requested by the City that is not included in one <br />of the items listed in any other phase will be classified as supplemental services. <br />Travel to and from the site and other direct costs are included in the overhead rate and <br />will not be billed as a separate line item. Our fee for this work shall be lump sum and <br />shall be billed monthly based on percentage of completion. Our fee shall be payable as <br />follows.. <br />Task 01 - Project Management <br />$ <br />12,880.00 <br />Task 02 - Pre -Bid Preparation <br />$ <br />44,020.00 <br />Task 03 - Bid Support Services <br />$ <br />8,420.00 <br />Task 04 - Construction Phase Services <br />$ <br />71,20500 <br />Total: <br />$ <br />136,525.00 <br />Sincerely, <br />ACCEPTED DATE <br />ATK-25-001 DGrev1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.