My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-102
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 10:35:20 AM
Creation date
6/2/2025 10:34:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/06/2025
Control Number
2025-102
Agenda Item Number
9.N.
Entity Name
Atkins North America, Inc.
Subject
Engineering Services Work Order 09 for Central Wastewater Treatment Facility Odor Control Project
Project Number
IRCDUS Proj. ID: 22.22.513
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A 0"AtkinsRealis <br />Work Order 9 <br />A draft of the updated documents will be submitted to IRCDUS for review <br />followed by a Review Workshop. The Review Workshop will be held in-person <br />and attended by up to three (3) members of the AtkinsRealis project team. <br />AtkinsRealis will address all comments from the Review Workshop and will <br />prepare and submit 100% construction bid documents, consisting of the <br />following: <br />• One (1) copy of a summary of the responses to comments provided <br />during the Review Workshop. <br />• Four (4) hard copies and one (1) electronic copy in PDF format of the <br />signed and sealed Construction Documents. <br />• One (1) copy of the updated Consultant's revised OPCC and Bid Form. <br />2.3 FDEP Permit <br />AtkinsRealis will prepare DEP Form 62-620.910 Application for a Minor Revision <br />to a Wastewater Facility or Activity Permit for I RCDUS signature and submission <br />to FDEP. <br />Task 02 Deliverables: Draft Risk Register, Draft Asset Management Register, Bid Checklist, <br />Draft and Final Bid Documents (Drawings & Specifications), Updated <br />County Div 0 Documents, Review Workshop Agenda, Compiled <br />Comments with Responses, Updated OPCC, Bid Form, and FDEP <br />Permit <br />TASK 03 BID SUPPORT SERVICES <br />3.1 Pre -Bid Meeting <br />AtkinsRealis will attend an in-person pre-bid meeting scheduled by IRCDUS and <br />will present project details and technical information. <br />3.2 Bid Addenda <br />AtkinsRealis will consider written questions from bidders related to the project <br />and prepare all addenda as required to interpret, clarify or expand the Contract <br />Documents. A maximum of two (2) addenda will be completed. Addenda will be <br />submitted to the IRCDUS Project Manager in a timely manner that allows <br />reception of addenda by all bidders, with the final addendum to be provided no <br />later than a minimum of five (5) days prior to bid opening date. <br />3.3 Recommendation of Award <br />AtkinsRealis will review the bid submittals and provide a recommendation of <br />award to IRCDUS. <br />Task 03 Deliverables: Bid Addenda, Recommendation of Award <br />TASK 04 CONSTRUCTION PHASE SERVICES <br />AtkinsRealis will provide construction phase services for up to twelve months following the <br />notice of award. Construction phase services will include the tasks as defined below. <br />Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.