Laserfiche WebLink
Exhibit A <br />Work Order 9 <br />4.6 Change Orders <br />IXAtkinsRealis <br />AtkinsR6alis will support up to two (2) change orders. Services associated with <br />change orders will include review of Contractor's request and pricing/quotes, <br />submittal of written justification for the change order to IRCDUS for approval and <br />issuance of change directives. <br />4.7 Progress Meetings and Site Visits <br />AtkinsR6alis will attend up to twelve virtual monthly progress meetings, facilitated <br />by the Contractor. AtkinsR6alis will assist the Contractor with maintaining the <br />project schedule, Project Risk Register and Asset Management Register <br />throughout construction, with regular check -ins during progress meetings. <br />In addition to progress meetings, AtkinsR6alis will conduct up to six (6) site visits <br />to review progress of construction, confirm adherence to design criteria, evaluate <br />site conditions relating to any RFI's or Change Orders, and record relevant <br />documentation of construction progress. Details of each site visit will be <br />documented in a Site Inspection. <br />4.8 Substantial and Final Completion Activity <br />AtkinsR6alis will conduct a substantial completion site visit to review progress of <br />construction and prepare associated punch list. A final completion walk-through <br />will be performed to verify the completion of all substantial completion punch list <br />items. AtkinsR6alis will assist IRCDUS and the Contractor to ensure that all <br />Substantial and Final Completion requirements, along with all other project <br />documentation mandated by the Contract, are fulfilled. The final completed Asset <br />Management Register and Risk Register will be provided to IRCDUS. <br />4.9 Permit Closeout <br />Upon acceptance of completion of the punch list items, AtkinsR6alis will prepare <br />the FDEP Notification of Completion of Construction for Wastewater Facilities or <br />Activities for IRCDUS execution and submittal to FDEP. <br />4.10 Record Drawings <br />AtkinsR6alis will develop the Record Drawings from the As -built Drawings <br />supplied by the Contractor. AtkinsR6alis will identify any substantive deviations <br />from the original design documents and certify whether the deviations are such <br />that the original engineering design intent has or has not been materially <br />accomplished by the finished construction. <br />AtkinsR6alis shall submit stamped Record Drawings, consisting of one full-size <br />set and one electronic copy in PDF format. <br />Task 04 Deliverables: Conformed Contract Documents, Shop Drawing Submittal Reviews, RFI <br />Responses, Pay Request and Variance Analysis Reviews, Change Order <br />Reviews and Directives, Meeting Agendas and Minutes, Project Action <br />Item List, Site Inspection Reports, Punch List, Final Risk Register, Final <br />Asset Management Register, FDEP Notice of Completion, and Record <br />Drawings. <br />Page 5 of 8 <br />