My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-103
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 10:38:06 AM
Creation date
6/2/2025 10:37:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/06/2025
Control Number
2025-103
Agenda Item Number
9.P.
Entity Name
Shulke, Bittle & Stoddard, LLC
Subject
Engineering Services Work Order 01 for Old Dixie Highway Drainage Westport Drive to 131st Street
Project Number
IRC-2507
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.EXHIBIT `A' <br />SCOPE OF WORK <br />WORK ORDER No. <br />Project Description <br />The proposed project will provide engineering services including evaluation and design for the <br />construction of alteration of and/or addition to drainage infrastructure to prevent localized flooding <br />in the Old Dixie Highway area ("Site") in north Indian River County ("County"). <br />This project has been initiated based on complaints by local residents regarding flooding in their <br />yards which, accordingto their testimonies, during substantial rainfall events, were due to upwelling <br />of groundwater originating from the Sandridge, into their yards, and steady stream of stormwater <br />free-flowing from the west to east streets west of ODH, which then collects and floods at the lowest <br />point of ODH and floods many residential properties east of ODH. <br />Based on our preliminary visual on-site investigation, the probable modifications are as follows: <br />• Construct roadside swales with swale blocks along the west to east streets that lie west of <br />Old Dixie Highway ("ODH") that drain unabated into ODH, <br />• Construct similar swales along ODH Right -of -Way to capture, retain and convey run-off, <br />• Construct underdrain system along ODH to intercept the groundwater that is draining from <br />the sand ridge, which is upwelling onto ODH and the yards of the home sites to the east of <br />1XIDIMIEZI <br />• Construct/Retrofit (existing) drainage conveyance facilities that drain to the Indian River <br />Lagoon. <br />Scope of Work <br />Schulke, Bittle & Stoddard, L.L.C. ("SBS") will provide services including site <br />investigation/survey, document research, engineering design, hydraulic computations, preparation <br />of construction plans, assist IRC in contractor procurement, preparation and submittal of permit <br />applications as required to assess, analyze and design drainage system modifications and/or <br />additions to prevent or mitigate localized flooding conditions that occur at the Site. (see Attachment <br />"A" for "Location Sketch"). <br />The estimated construction cost of this project is: $1,338,761.63. <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.