Laserfiche WebLink
1st Street SW & 271h Avenue <br />Intersection Improvements <br />EXHIBIT A <br />SCOPE OF WORK <br />The COUNTY desires to reconstruct the 1" Street SW and 27" Avenue intersection to include the <br />following: <br />• Dedicated eastbound and westbound left -turn auxiliary lanes <br />• Mast -arm signalization w/ pedestrian movements <br />• Pedestrian facilities along the north side of 1St Street SW between 29th Avenue and 24th <br />Avenue <br />• Minimized Florida Power and Light (FPL) transmission pole impacts <br />The County agrees to provide (in a timely manner) the following material, data, or services as required in <br />connection with the work to be performed under this Agreement; all of which information the CONSULTANT <br />may use and reasonably rely upon: <br />A. Provide the CONSULTANT with a geotechnical investigation, traffic counts, preliminary data or <br />reports available, existing location surveys, topographic survey, and related documents required <br />to complete the construction documents. <br />B. Provide the CONSULTANT with all available drawings, right-of-way maps, and other documents <br />in the possession of the County pertinent to the project. <br />C. The County shall make provisions for the CONSULTANT to enter upon public and private property <br />as required for the CONSULTANT to perform his services. <br />D. The County will promptly execute all permit applications and provide application and review fees <br />necessary to expedite the acquisition of any local, state or federal permits made necessary by <br />the project. <br />E. The County will pay for all jurisdictional agency permit fees. <br />The PROJECT LIMITS are projected to extend 1,200 feet east and west from 27th Avenue along 152 Street SW <br />and 300 feet north and south along 27th Avenue from 1st Street SW for a total project length of 3,000 feet <br />(0.57 miles). <br />A. Roadway Analysis and Plans: <br />Roadway set of plans shall consist of the following: <br />60% <br />90% <br />100% <br />Cover Sheet <br />C <br />C <br />F <br />Summary of Pay Items <br />P <br />C <br />F <br />Typical Sections <br />C <br />C <br />F <br />Summary of Quantities & General Notes <br />P <br />C <br />F <br />Summary of Drainage Structures Sheets <br />P <br />C <br />F <br />Project Layout <br />C <br />C <br />F <br />