My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-114
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 11:49:02 AM
Creation date
6/2/2025 11:48:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/20/2025
Control Number
2025-114
Agenda Item Number
9.M.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Engineering Services Work Order 20 for 1st Street SW & 27th Avenue Intersection;
Project Number
IRC-1231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1st Street SW & 27th Avenue <br />Intersection Improvements <br />Plan and Profile Sheets (40 scale) <br />C <br />C <br />F <br />Intersection Plan & Details <br />P <br />C <br />F <br />Special Details <br />P <br />C <br />F <br />Drainage Structure Sheets <br />P <br />C <br />F <br />Roadway Soil Survey <br />P <br />C <br />F <br />Cross Sections at 100 ft intervals <br />P <br />C <br />F <br />Stormwater Pollution Prevention Plans <br />P <br />C <br />F <br />Signage & Pavement Marking Plans <br />(40 scale double plan) <br />C <br />C <br />F <br />Signalization Plans <br />P <br />C <br />F <br />Construction Cost Estimate and Quantities <br />C <br />C <br />F <br />Notes: P — Preliminary, C — Complete, but subject to change, F - Final <br />The plans will be prepared based upon English units. Design will be conducted in MicroStation and <br />Geopak. The following additional data shall be utilized for development of the plans: <br />1. The roadway plans sheets will be drawn at a scale of 1" = 40' prepared on 11" x 17" sheets. <br />2. Plan sheets shall depict existing right-of-way, section lines, property lines, temporary <br />construction easements, and centerline of construction. Horizontal control points with state <br />plane coordinates for all PC's, PT's, curve radius, curve length and horizontal PI's shall be included <br />on the Plan or summarized in an alignment table. <br />3. Plans shall include spot grades adequate to describe any proposed grading. <br />4. Match lines shall not be located within the limits of an intersection. <br />5. If applicable, soil boring information shall be plotted on cross sections with soil classification and <br />high season water table. <br />6. All quantities shall reference FDOT Pay Item Numbers. <br />7. All details shall reference FDOT Index Numbers. <br />8. All specifications shall reference to County and/ or FDOT Specifications for Road and Bridge <br />Construction. Any deviations are special specifications not included in FDOT Specifications are <br />required in the Technical Specifications. <br />9. Initial, interim and Final Plan Submittal shall include the following: <br />i. Three (3) Sets of Signed and Sealed Plans. <br />ii. One (1) Opinion of Probable Construction Cost <br />iii. One (1) CD with drawings in PDF format. <br />iv. The CONSULTANT will provide construction documents and calculations in <br />sufficient quantity as required by the various reviewing agencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.