My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-110
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 12:30:53 PM
Creation date
6/5/2025 12:30:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/20/2025
Control Number
2025-110
Agenda Item Number
9.I.
Entity Name
Aptim Environmental & Infrastructure, LLC
Subject
Work Order No. 2018029-13 for Sector 5 Hurricanes Ian & Niclole Pre-Construction
and Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUE COPY <br />`RTi>^ICATION ON LAST PAGE <br />N L. BUTLER, CLERK <br />� <br />APTIM March 31, 2025 <br />Page 3 of 5 <br />Task 4: Pre -Construction Meetings and Submittals <br />APTIM will prepare for, attend, and lead a pre -construction meeting with the permitting agencies and the <br />County's Contractor at the County's offices. Following the meeting with the agencies, the County, APTIM <br />and the Contractor will meet to discuss other aspects of the project. APTIM will take notes from the <br />meetings and distribute meeting minutes. APTIM will prepare the required pre -construction submittals to <br />the FDEP in order to commence the project, which may include Plans and Specifications; Turbidity <br />Monitoring Qualifications; and Biological Monitoring Qualifications; and Sea Turtle Nesting Plan. APTIM <br />will upload the submittal to FDEP's JCP Compliance file transfer site. <br />Deliverable <br />APTIM will provide meeting minutes from the pre -construction meeting. APTIM will also send the <br />Commencement Notification letters to the required permitting agencies after corresponding with the <br />Contractor regarding their schedule to begin construction. <br />Schedule <br />The schedule of task specific deliverables is provided in the Scope of Work for this task. An overall fixed <br />schedule cannot be developed as the Contractor's schedule is unknown. APTIM will attempt to execute <br />each phase of the work in as expeditious a manner as possible. <br />Cost <br />The lump sum cost for this task is $7,154.80. <br />Task 5: Late Season Sea Turtle Monitoring <br />APTIM will oversee the scope of work proposed by EAI and provide the necessary administrative <br />coordination to the County. EAI has provided the enclosed proposal and cost breakdown for sea turtle <br />monitoring tasks, which states: <br />Late season sea turtle monitoring, nest relocation, and ancillary professional services in support <br />of the Sector 5 Beach and Dune Restoration Project. <br />This scope of work was developed based on conditions and requirements set forth in standard <br />regulatory permits and the following documents: <br />• Florida Department of Environmental Protection (FDEP) Joint Coastal Permit <br />(JCP) 0363427 -001 -JC <br />• U.S. Fish and Wildlife Service (USFWS) Revised Statewide Programmatic Biological <br />Opinion (BO) dated March 13, 2015 <br />The following tasks may be performed under this work order include: <br />• Task 1: Late Season Sea Turtle Monitoring (FDEP Specific Condition 11) <br />• Task 2: Late Season Nest Relocation (FDEP Specific Condition 11) <br />• Task 3: Reporting <br />Cost <br />The lump sum cost for this task is $25,820.95. <br />
The URL can be used to link to this page
Your browser does not support the video tag.