Laserfiche WebLink
A TRUE COPY <br />STATEMENT OF WORK CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />This Statement of Work ("SOW") is made and entered into as of 5/21/2025, by and between Indian <br />River County Emergency Services ("Customer") and Communications International ("Ci"), pursuant to <br />Ci's standard terms and conditions listed in Appendix C (the "Agreement"). <br />1.0 Project Overview <br />This SOW defines the scope of work, deliverables, responsibilities, and timeline associated with a Project <br />for the add-on four microwave hops at the Customer's Environment in Indian River County. Ci <br />shall provide the Equipment and Software listed in Appendix A to this SOW and shall deliver the <br />Services described in this SOW to complete the Deliverables listed below. <br />2.0 Deliverables <br />Ci shall complete the following Deliverables: <br />• Deliverable 1: Install the new Indian River North to Indian River West microwave link using six- <br />foot antennas <br />• Deliverable 2: Install the new Indian River West to Egret microwave link using three-foot <br />Diversity uW antennas and a six-foot uW antenna <br />• Deliverable 3: Install the new Hobart to FS -2 microwave link using six-foot antennas <br />• Deliverable 4: Upgrade the Indian River South to FS -2 microwave link from 60Mbps to <br />191Mbps <br />3.0 Tasks <br />The tasks to be performed under this SOW are described below in several categories. Where conflicts arise <br />between documents this document shall supersede. <br />Estimated <br />Task <br />Completion Date <br />Number <br />Description <br />(days after NTP) <br />1.0 <br />IR North to IR West Link <br />1.1 <br />Install New 6 Ft Microwave Antenna and Waveguide and Align to <br />112 days <br />IR West Tower <br />1.2 <br />Install New 6 Ft Microwave Antenna and Waveguide and Align to <br />112 days <br />IR North Tower <br />1.3 <br />Install New microwave radio in existing rack power from existing <br />112 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />Program & Install MPLS expansion <br />1.4 <br />Install new microwave radio in existing rack power from existing <br />112 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />