My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-114A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 12:52:54 PM
Creation date
6/5/2025 12:50:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/20/2025
Control Number
2025-114A
Agenda Item Number
9.O.
Entity Name
Communications International
Subject
Agreement for Upgrade to Public Safety Land Mobile Radio Network
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION CLERK <br />PAGE <br />RYAN L. BUTLER, <br />Program & Install MPLS Expansion <br />1.5 <br />Verify Link BER and transfer traffic from existing Hobart to IR <br />113 days <br />West link. <br />1.6 <br />Shut down Existing Link from Hobart to IR West <br />114 days <br />Remove uW radios from both sites <br />These radios will be saved for use in another link later. <br />2.0 <br />IR West to Egret <br />2.1 <br />Remount existing to Hobart Antenna and realign to Egret Marsh <br />119 days <br />Tower. <br />Install new Twist Flex Waveguide as needed <br />2.2 <br />Install New 3ft Diversity uW antenna & EU63 waveguide Align to <br />119 days <br />Egret Marsh <br />2.3 <br />Install New 3ft Diversity uW antenna & Align to IR west <br />120 days <br />2.4 <br />Install New 6Ft uW antenna & Align to IR West <br />120 days <br />2.5 <br />Install New microwave radio in existing rack, power from existing <br />121 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />Program & Install MPLS SAR -8 <br />2.6 <br />Install new microwave radio in existing rack power from existing <br />121 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />Program & Install New MPLS SAR 8 <br />2.7 <br />Verify Link BER and verify traffic <br />122 days <br />3.0 <br />Hobart to FS -2 Link <br />3.1 <br />Remount existing to IR West Antenna and realign to FS -2 Tower. <br />128 days <br />Install new Twist Flex Waveguide as needed <br />3.2 <br />Install New 6 Ft Microwave Antenna and Waveguide and Align to <br />128 days <br />Hobart Tower <br />3.3 <br />Install New microwave radio in existing rack power from existing <br />129 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />Program & Install New MPLS SAR 8 <br />3.4 <br />Install new microwave radio in existing rack power from existing <br />129 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />Program & Install New MPLS SAR 8 <br />3.5 <br />Verify Link BER and verify traffic <br />130 days <br />4.0 <br />IR South to FS -2 <br />4.1 <br />Verify Traffic from Hobart before dropping this link <br />132 days <br />4.2 <br />Upgrade 11 GHz Link from 60 Mbps to 191 Mbps <br />133 days <br />4.3 <br />Upgrade 11 GHz Link from 60 Mbps to 191 Mbps <br />133 days <br />4.4 <br />Connect into MPLS at both locations <br />134 days <br />4.5 <br />Verify Link BER and verify traffic <br />135 days <br />
The URL can be used to link to this page
Your browser does not support the video tag.