Laserfiche WebLink
A TRUE COPY <br />CERTIFICATION CLERK <br />PAGE <br />RYAN L. BUTLER, <br />Program & Install MPLS Expansion <br />1.5 <br />Verify Link BER and transfer traffic from existing Hobart to IR <br />113 days <br />West link. <br />1.6 <br />Shut down Existing Link from Hobart to IR West <br />114 days <br />Remove uW radios from both sites <br />These radios will be saved for use in another link later. <br />2.0 <br />IR West to Egret <br />2.1 <br />Remount existing to Hobart Antenna and realign to Egret Marsh <br />119 days <br />Tower. <br />Install new Twist Flex Waveguide as needed <br />2.2 <br />Install New 3ft Diversity uW antenna & EU63 waveguide Align to <br />119 days <br />Egret Marsh <br />2.3 <br />Install New 3ft Diversity uW antenna & Align to IR west <br />120 days <br />2.4 <br />Install New 6Ft uW antenna & Align to IR West <br />120 days <br />2.5 <br />Install New microwave radio in existing rack, power from existing <br />121 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />Program & Install MPLS SAR -8 <br />2.6 <br />Install new microwave radio in existing rack power from existing <br />121 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />Program & Install New MPLS SAR 8 <br />2.7 <br />Verify Link BER and verify traffic <br />122 days <br />3.0 <br />Hobart to FS -2 Link <br />3.1 <br />Remount existing to IR West Antenna and realign to FS -2 Tower. <br />128 days <br />Install new Twist Flex Waveguide as needed <br />3.2 <br />Install New 6 Ft Microwave Antenna and Waveguide and Align to <br />128 days <br />Hobart Tower <br />3.3 <br />Install New microwave radio in existing rack power from existing <br />129 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />Program & Install New MPLS SAR 8 <br />3.4 <br />Install new microwave radio in existing rack power from existing <br />129 days <br />uW DC Power supply <br />Assist tower crew with alignment and verify RSSI with pathloss <br />Program & Install New MPLS SAR 8 <br />3.5 <br />Verify Link BER and verify traffic <br />130 days <br />4.0 <br />IR South to FS -2 <br />4.1 <br />Verify Traffic from Hobart before dropping this link <br />132 days <br />4.2 <br />Upgrade 11 GHz Link from 60 Mbps to 191 Mbps <br />133 days <br />4.3 <br />Upgrade 11 GHz Link from 60 Mbps to 191 Mbps <br />133 days <br />4.4 <br />Connect into MPLS at both locations <br />134 days <br />4.5 <br />Verify Link BER and verify traffic <br />135 days <br />