Laserfiche WebLink
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />4.0 Acceptance Criteria <br />The Deliverables shall be considered complete when the following criteria are met: <br />Deliverable <br />Deliverable Description <br />Acceptance Criteria <br />Number <br />1 <br />Install the new Indian River <br />Listed in Appendix B <br />North to Indian River West <br />microwave link using six-foot <br />antennas <br />2 <br />Install the new Indian River West <br />Listed in Appendix B <br />to Egret microwave link using <br />three-foot Diversity uW antennas <br />and a six-foot uW antenna <br />3 <br />Install the new Hobart to FS -2 <br />Listed in Appendix B <br />microwave link using six-foot <br />antennas <br />4 <br />Upgrade the Indian River South <br />Listed in Appendix B <br />to FS -2 microwave link from <br />60Mbps to 191Mbps <br />5.0 Project Responsibilities and Assumptions <br />5.1 Ci Responsibilities <br />Ci shall be responsible for: <br />a) Delivery, installation, configuration, and programming of all Equipment <br />b) Configuration and setup of all Software <br />c) Coordination of installation and construction activities with Customer to minimize <br />disruption to the Customer Environment while still completing the project on time <br />and on -budget. <br />d) Management of any Ci subcontractors that are performing or contributing to the <br />Tasks associated with this SOW. <br />e) Compliance with applicable safety and operational standards and applicable <br />government regulations. <br />5.1 Customer Responsibilities <br />Customer shall be responsible for: <br />a) Designating a primary point of contact to coordinate the work associated with this <br />SOW. <br />b) Providing Ci and/or its subcontractors timely access to Customer Environment as <br />needed to complete the Tasks. <br />