My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/22/2025
CBCC
>
Meetings
>
2020's
>
2025
>
04/22/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 10:25:59 AM
Creation date
6/10/2025 9:06:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/22/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Florida <br />* * MEMORANDUM <br />�IO4' <br />File ID: 25-0437 Type: Consent Staff Report <br />TO: Indian River County Board of County Commissioners <br />THROUGH: John A. Titkanich, Jr, County Administrator <br />Sean C. Lieske, Director of Utility Services <br />Jennifer Hyde, Purchasing Manager <br />FROM: Howard G. Richards, PE, Manager - Capital Projects <br />DATE: March 19, 2025 <br />Indian River County <br />Administration Complex <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />indianriver.gov <br />Meeting Date: 4/22/2025 <br />SUBJECT: Award of Bid No. 2025018 to Lawrence Lee Construction Services, Inc. for <br />Phase 2 of Upper Floridan Aquifer SIR Well Head & Raw Water Main, IRCDUS <br />Project ID 11.22.503 <br />BACKGROUND <br />Indian River County Department of Utility Services (IRCDUS) owns and operates the South County Wellfield <br />comprising of seven (7) Upper Floridan Aquifer (UFA) source water wells that provide raw water to the Oslo <br />Water Treatment Plant (WTP). Well no. S1 is being replaced with a new well, SIR, due to its collapse <br />sometime in 2021 which was deemed unsalvageable. <br />Construction of the SIR Project, referred to as Upper Floridan Aquifer SIR Well Head & Raw Water Main <br />(IRCDUS Project ID 11.22.503), is being implemented in two (2) phases: Phase 1 is the drilling of the new <br />well, and Phase 2 is construction of the wellhead and new raw water main (RWM) to Oslo WTP. <br />On February 15, 2022, the Indian River County Board of County Commissioners (BCC) approved Work Order <br />No.8 (WO 8) to Kimley-Horn and Associates, Inc. (KHA) pursuant to the Agreement for Professional Services <br />for Water Plant and Water Resources Engineering Services (RFQ 2019070), dated November 5, 2019, to <br />provide design, permitting, bid, and construction phase services for the S 1 R Project. <br />On January 23, 2024, the BCC approved the award of Bid 2024024 to Florida Design Drilling, Inc. (FDD) for <br />Phase 1 of the S 1 R Project. Phase 1 is now complete, and the project is transitioning to Phase 2. On October 8, <br />2024, KHA's WO 8 was amended to provide additional engineering services for bid and construction phase <br />services, wildlife site survey, extended hydrogeologist work hours, and final project deliverables. <br />ANALYSIS <br />Upon completion of design for Phase 2 of the SIR Project, the Purchasing Division, on behalf of IRCDUS, <br />advertised Invitation to Bid (ITB) 2025018 on December 1, 2024. A non -mandatory pre-bid meeting was held <br />at the project site for prospective bidders on December 9, 2024. Three addenda were subsequently issued on <br />Indian River County, Florida Page 1 of 3 Printed on 4/17/2025 <br />powered by LegistarT" 187 <br />
The URL can be used to link to this page
Your browser does not support the video tag.