My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-129
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 11:10:02 AM
Creation date
7/10/2025 11:09:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/17/2025
Control Number
2025-129
Agenda Item Number
9.I.
Entity Name
Schulke Bittle and Stoddard, LLC
Subject
Engineering Services Work Order 2 for Design of a Transit Maintenance Building Addition
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Fire protection systems (a fire sprinkler system is not anticipated to be required and <br />is not included in the scope of services) <br />H. Energy Code Calculations/ modeling per F.B.C.. <br />03 The CONSULTANT shall design and prepare a complete set of site construction plans for <br />obtaining IRC Site Plan Approval, building permits, and other site development <br />jurisdictional agency permits. These plans shall include: <br />A. Site Plan <br />B. Landscape design <br />C. Site Electrical / site lighting <br />D. Clearing, Earthwork, drainage and paving <br />E. Utilities <br />.04 The CONSULTANT shall prepare complete civil site development drawings for the <br />construction of water and sewer, electric, phone, and storm water management system <br />requirements. All coordination with utility providers, design, relocation or routing, and <br />scheduling shall be by the CONSULTANT. <br />.05 The CONSULTANT shall provide Landscape Designs conforming to local ordinances and <br />coordinate all underground chases, routes and clearances below walks and drives. <br />.06 Prepare Construction Documents. It is anticipated that Technical written specifications <br />will be included in sufficient detail on the Construction drawings prepared by each <br />respective sub -consultant, and that a separate technical written specifications document <br />will not be necessary for this project. <br />.07 Permits: The CONSULTANT will prepare permit applications for all government agencies <br />with jurisdiction, including: <br />A. Site Development Permits: Prepare calculations, reports, sketches, and application <br />forms to accompany construction plans for required Federal, state and local site <br />development permits, including: <br />1.*IRC Site Plan (TRC, P&Z) <br />2.**IRC Concurrency <br />3.*IRC Stormwater <br />4.*IRC Land Clearing and Tree removal <br />5.**IRC water and sewer utility <br />6.*SJRWMD ERP / (10-2 or exemption, or minor mod to existing permit) <br />7.**FDEP NOI — (SWPPP) <br />8.**FDEP — (General) Water system extension (if required) <br />9.**FDEP — (General) Sewer collection System (if required) <br />*Note: this is commenced at 30% to 60% complete construction drawings (preliminary <br />design documents). <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.