My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2025
CBCC
>
Meetings
>
2020's
>
2025
>
06/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 10:06:43 AM
Creation date
7/18/2025 9:38:17 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/17/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01 The CONSULTANT shall assist the COUNTY with the Contract Administration and <br />Inspections, including: attend progress meetings, review shop drawings and contractors <br />submittals, and provide routine site inspections to verify the work is proceeding in <br />accordance with the plans and specifications for the purposes of certification upon <br />completion of the work. Inspections shall be documented with written reports and digital <br />photographs. The CONSULTANT will coordinate the responsibility for document review, <br />meeting attendance, and inspections with civil engineer, architect and other consultants. <br />The construction period is estimated to be six (6) months, and CA and inspection fees have <br />been estimated by the CONSULTANT based on this time frame, and the tasks and frequency <br />of services listed below. Anticipated tasks / services include: <br />A. Site: <br />1. Coordinate and attend pre -construction meetings. (1) <br />2. Attend progress meetings with contractor/ field inspections <br />engineer - (1 /month)= 6 total <br />3. Review shop drawings (All) <br />4. Review contractors pay requests (3 total) <br />5. Periodic inspections of the site work (2+4 week) <br />6. Substantial completion inspection / punch list (1) <br />7. Review as-builts for adequacy and completeness (1) <br />8. Final inspection / final completion determination (1) <br />9. Prepare final certification submittals for site permits <br />B. Building: <br />1. Coordinate and attend pre -construction meetings. (1) <br />2. Attend progress meeting with contractor / field inspection of bldg. <br />construction: Architect & MEP (1 / month = 6 total) <br />3. Review shop drawings (All) <br />4. Review contractors pay requests (3 total) <br />7. Inspections from Structural— as needed <br />8. Substantial completion inspection / punch list (1) <br />9. Final inspection / final completion determination (1) <br />C. Changes to Work: Oversee changes to work, field directives, minor plan <br />changes, administer construction change orders. <br />10 <br />119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.