My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-144
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 12:34:59 PM
Creation date
7/28/2025 12:34:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/01/2025
Control Number
2025-144
Agenda Item Number
16.B.1.
Entity Name
Geosyntec Consultants
Subject
Engineering Services Work Order 9 for One Year of Groundwater Monitoring/Reporting
at the former South Gifford Road Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br />consultants <br />Mr. Himanshu H. Mehta, P.E. <br />Managing Director <br />Solid Waste Disposal District <br />Indian River County <br />132574 1h Avenue SW <br />Vero Beach, Florida 32968 <br />6770 South Washington Avenue, Suite 3 <br />Titusville, Florida 32780 <br />PH 321.269.5880 <br />www.geosyntce.coni <br />21 May 2025 <br />Subject: Proposal to Provide One Year of Groundwater Monitoring/Reporting and Related <br />Consulting Services <br />Former South Gifford Road Landfill <br />Vero Beach, Indian River County, Florida <br />Dear Mr. Mehta: <br />Geosyntec Consultants (Geosyntec) is pleased to submit this letter proposal to the Indian River County <br />(IRC) Solid Waste Disposal District (SWDD) to provide professional services for Florida Department <br />of Environmental Protection (FDEP)-required activities associated with continued implementation of <br />the groundwater monitoring for the chlorinated volatile organic compound (CVOC) plume at the <br />Former South Gifford Road Landfill located in Vero Beach, Indian River County, Florida (Site). This <br />scope and fee proposal is based on correspondence with the FDEP and discussions with IRC. As <br />requested by IRC, this fee proposal includes budget for the following activities: <br />• Complete two semi-annual monitoring events for the plume monitoring well network, <br />• Provide related consulting services, <br />• Represent IRC during interactions with regulatory agencies, <br />• Prepare an annual pollution liabilities evaluation report for identified IRC -owned <br />environmental liabilities, and <br />• Prepare an annual groundwater monitoring report summarizing semi-annual sampling activities <br />and results. <br />Geosyntec has prepared this proposal (professional services as Exhibit A) as Work Order No. 9 for the <br />2023 Continuing Contract Agreement for Professional Services between IRC SWDD and Geosyntec. <br />The remainder of this letter provides an overview of the project background, a description of the <br />proposed scope of work, a budget estimate, and a discussion of the schedule for accomplishment of the <br />work described herein. <br />FR0766\XR25016 <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.