My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-144
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 12:34:59 PM
Creation date
7/28/2025 12:34:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/01/2025
Control Number
2025-144
Agenda Item Number
16.B.1.
Entity Name
Geosyntec Consultants
Subject
Engineering Services Work Order 9 for One Year of Groundwater Monitoring/Reporting
at the former South Gifford Road Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />21 May 2025 <br />Page 2 <br />PROJECT BACKGROUND <br />Geosyntec"' <br />consultants <br />As part of the long-term monitoring activities for the identified CVOC plume associated with the South <br />Gifford Road Landfill, a network of monitoring wells require sampling on an annual or semi-annual <br />basis to: (i) confirm that the CVOC plume is not migrating by monitoring the lateral and vertical extent; <br />(ii) evaluate the impact of source and dissolved plume bioremediation to assess CVOC plume centerline <br />concentrations over time; and (iii) assess the impact of biological and physical natural attenuation <br />processes on CVOC plume degradation. <br />Geosyntec conducted previous bioremediation injection events in 2008, 2009, 2012, and 2017 to <br />remediate recalcitrant CVOC groundwater impacts in the downgradient biobarriers and in the former <br />source area. Following well re -development in February 2024, CVOC concentrations in several source <br />area wells have decreased indicating improved groundwater conditions in the former source area. <br />Concentrations of contaminants of concern were observed to be stable or have no trend during 2024 <br />monitoring events. The plume network will continue to be monitored in 2025, following a 38% <br />reduction in the monitoring plan in 2024. <br />PROPOSED SCOPE OF WORK <br />For the purpose of budgeting, the scope of work has been divided into the following phases: <br />• Phase 1 — Project Management, <br />• Phase 2 — Meetings/Regulatory Interaction, <br />• Phase 3 — Annual Pollution Remediation Liabilities Evaluation, <br />• Phase 4 — Semi -Annual Sampling Activities, and <br />• Phase 5 — Data Evaluation and Annual Reporting. <br />The remainder of this section presents a general description of the activities to be performed in each <br />phase. <br />Phase 1 — Proiect Management: Under this phase, Geosyntec will perform project planning and <br />management responsibilities, such as correspondence with IRC SWDD and FDEP, invoice review, <br />project coordination, and project administration. The budget includes two hours per month for the <br />project manager (24 hours total) and one hour per month (12 hours total) for the project administrator. <br />Phase 2 — Meetino/Regulatory Interaction: Under this phase, Geosyntec will prepare for and attend <br />up to one meeting, with IRC SWDD, FDEP, and/or IRC Board of County Commissioners, as necessary. <br />It has been assumed that this meeting will be in person. Also, under this phase, four hours has been <br />FR0766\XR25016 <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.