Laserfiche WebLink
66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) <br />PROJECT NO. IRC -1505 BID NO. 2021018 <br />Item'No: <br />Descn' tion_, <br />Unit <br />Quanta :e:_ <br />UnitPeice <br />Price`Incr`ease . , <br />Pnce•Decrease _ <br />WCDO12 033- <br />1A ROAD <br />0430 175 118 PIPE CULVERT, RCP, ROUND, 18" S/CD FDOT NON - <br />PARTICIPATING <br />LF <br />253 <br />86.00 <br />21 758.00 <br />WCDO12 035- <br />0430 175 124 PIPE CULVERT, RCP, ROUND, 24" S/CD FDOT NON - <br />1A ROAD <br />PARTICIPATING <br />LF <br />59 <br />102.00 <br />6,018.00 <br />WCDO12 NEW <br />ITEM NO 1 <br />0425 146 5 INLETS CURB TYPE J-6 PARTIAL FDOT NON -PART <br />EA <br />1 <br />4,875.00 <br />4,875.00 <br />WCDO12 NEW <br />ITEM NO 2 <br />0425 1551 18 INLET TYPE E <10' FDOT NON -PARTICIPATING <br />EA <br />5 <br />5,324.28 <br />26 621.40 <br />WCD013 <br />REPLACE HEADWALL W/TYPE C DBI - NON PART <br />LS <br />1 <br />6,372.06 <br />6,372.06 <br />WCDO14 195- <br />1 B ROAD <br />425-1-521 INLETS DT BOT TYPE C <10' FDOT NON -PART <br />EA <br />5 <br />3,200.00 <br />16 000.00 <br />WCDO14197- <br />1 B ROAD <br />425-531 INLETS DT BOT TYPE C MOD <10' FDOT NON PART <br />EA <br />2 <br />3,250.00 <br />6,500.00 <br />WCDO14 198- <br />1 B ROAD <br />425-1-541 INLETS DT BOT TYPED <10' FDOT NON -PART <br />EA <br />4 <br />3.950.00 <br />15 800.00 <br />WCDO14 205- <br />1 B ROAD <br />425-2-61 MANHOLES (P -8)(<l 0FDOT NON -PART <br />EA <br />2 <br />4,600.00 <br />9,200.00 <br />WCDO14 207- <br />1 B ROAD <br />425-2-72 MANHOLES J-7 >10' FDOT NON -PART <br />LF <br />1 <br />13 500.00 <br />13 500.00 <br />WCDO14 208- <br />1 B ROAD <br />430-175-115 PIPE CULVERT RCP ROUND 15"SS FDOT NON <br />EA <br />65 <br />59.00 <br />3,835.00 <br />WCDO14 227- <br />1 B ROAD <br />430-982-123 MITERED END SECTION CONC) (15"CD) FDOT NON <br />EA <br />1 <br />1.417.00 <br />1,417.00 <br />WCDO15 <br />PRICE ADJ BITUMINOUS MAT'L FDOT PARTICIPATING <br />LS <br />1 <br />20 839.92 <br />20 839.92 <br />WCDO16 173- <br />1 B ROAD <br />120-1 REGULAR EXCAVATION - FDOT NON -PART <br />Cy <br />890 <br />3.50 <br />3,115.00 <br />WCDO16 NEW <br />PAY ITEM <br />LUMP SUM LABOR & EQUIP INSTALL TOE OF EACH PANEL ADDT <br />LS <br />1 <br />42 971.44 <br />42 971.44 <br />WCDO16 314 - <br />1B 61ST B <br />400-2-5 CONCRETE CALSS II SUBSTRUCTURE <br />LB <br />1 <br />1,260.00 <br />1,26 .00 <br />WCDO16 319 - <br />1 B 61ST B <br />415-1-5 REINFORCING STEEL - BRIDGE SUBSTRUCTURE <br />LS <br />8.064 <br />2.00 <br />16 128.00 <br />WCDO16 330- <br />16 65TH B <br />400-2-5A CONCRETE CLASS II SUBSTRUCTURE <br />Cy <br />1 <br />1,260.00 <br />1.260.00 <br />WCDO16 335- <br />1B 65TH B <br />415-1-5A REINFORCING STEEL - BRIDGE SUBSTRUCTURE <br />LB <br />8.064 <br />1.50 <br />12 096.00 <br />WCDO17 <br />RESET DRAINAGE STR SS-311A-FDOT NON PART <br />LS <br />1 <br />3,745.34 <br />3,745.34 <br />WCDO18 <br />ADJ FOR BITUMINOUS MAT'L 7/1/2022 -12/31/2022 FDOT PART <br />LS <br />1 <br />54 868.71 <br />54 868.71 <br />WCDO19 <br />700-2-12 MULTI -POST SIGN (F&I) (12-20SF FDOT NON -PART <br />EA <br />2 <br />4,400.00 <br />8,800.00 <br />FURNISH & INSTALL TWO LARGER PULL BOXES (17"X30") AT <br />WCD020 <br />57TH & 69TH - FDOT NON -PARTICIPATING <br />LS <br />1 <br />2,070.00 <br />2,070.00 <br />WCD023 054- <br />0522-2 SIDEWALK CONCRETE 6" THICK FDOT NON <br />1A ROAD <br />PARTICPATING <br />SY <br />1 2,390 <br />38.25 <br />91 428.21 <br />WCD023 235- <br />1 B ROAD <br />0522-2 SIDEWALK CONCRETE, 6" THICK FDOT NON <br />PARTICIPATING <br />SYS <br />2 096 <br />1 38.25 <br />80 168.94 <br />WCD024 <br />0536-73 GUARDRAIL REMOVEL - FDOT NON PARTICIPATING <br />EA <br />1.176 <br />5.00 <br />5.880.00 <br />WCD025 <br />ADJ FOR BITUMINOUS MAT'L 1/1/2023 - 3/31/2023 FDOT PART <br />LS <br />1 <br />10 951.86 <br />10 951.86 <br />ABANDON EXISTING WELL AT STA 392+24,16' RT (65TH ST <br />WCD027 <br />INTERSECTION) FDOT NON -PARTICIPATING <br />LS <br />1 <br />7568.46 <br />7.568.45 <br />PERFORM THERMAL INTEGRITY PROFILING (TIP) TESTING OF <br />DRILLED SHAFT #4 AT THE SW CORNER OF 57TH ST & 66TH <br />WCD028 <br />AVE <br />LS <br />1 <br />2083.73 <br />2.083.73 <br />INCORPORATE PLAN REVISION #19 BRIDGE WHICH <br />DECREASED THE WIDTH OF THE CORNER ABUTMENT PANELS <br />WCD029 <br />61ST & 65TH STREET BRIDGES <br />LS <br />1 1 <br />11 598.37 <br />11 598.37 <br />REIMBURSEMENT OF IDLE EQUIPMENT AT 61ST ST BRIDGE <br />WCD030 <br />WHILE RECASTING 4 NEW CORNER PANELS <br />LS <br />1 <br />49 699.20 <br />49 699.20 <br />RELOCATE PREVIOUSLY PLACED DRAINAGE STRUCTURE SS- <br />WCD031 <br />329 AND 32 LF 18" RCP AT ST 206+80 <br />LS <br />1 <br />3,686.93 <br />3,686.93 <br />REGRADE ALONG 66TH AVE BETWEEN STA 329+00 AND 338+00 <br />WCD032 <br />TO ADD A SWALE DITCH AND INSTALL ADDED DBI <br />LS <br />1 <br />27 928.96 <br />27 928.96 <br />RE -GRADE TO REVISED EP ELEVATION IN PLAN REVISION i , <br />WCD033 <br />SHEFT k Qm3j7PPImr nivininNPPn.IFCT.%%Ign."6th Ave Widenin­Lt <br />rv_LmwGWG92, <br />up <br />- <br />