My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-147
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:33:18 PM
Creation date
7/28/2025 1:32:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/15/2025
Control Number
2025-147
Agenda Item Number
9.D.
Entity Name
Haley Engineering Contractors, Inc.
Subject
Change Order No. 4 for Final Payment, Release of Retainage for Construction of 66th Ave Road
Widening (49th Street to 69th Street),
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) <br />PROJECT NO. IRC -1505 BID NO. 2021018 <br />Item'No: <br />Descn' tion_, <br />Unit <br />Quanta :e:_ <br />UnitPeice <br />Price`Incr`ease . , <br />Pnce•Decrease _ <br />WCDO12 033- <br />1A ROAD <br />0430 175 118 PIPE CULVERT, RCP, ROUND, 18" S/CD FDOT NON - <br />PARTICIPATING <br />LF <br />253 <br />86.00 <br />21 758.00 <br />WCDO12 035- <br />0430 175 124 PIPE CULVERT, RCP, ROUND, 24" S/CD FDOT NON - <br />1A ROAD <br />PARTICIPATING <br />LF <br />59 <br />102.00 <br />6,018.00 <br />WCDO12 NEW <br />ITEM NO 1 <br />0425 146 5 INLETS CURB TYPE J-6 PARTIAL FDOT NON -PART <br />EA <br />1 <br />4,875.00 <br />4,875.00 <br />WCDO12 NEW <br />ITEM NO 2 <br />0425 1551 18 INLET TYPE E <10' FDOT NON -PARTICIPATING <br />EA <br />5 <br />5,324.28 <br />26 621.40 <br />WCD013 <br />REPLACE HEADWALL W/TYPE C DBI - NON PART <br />LS <br />1 <br />6,372.06 <br />6,372.06 <br />WCDO14 195- <br />1 B ROAD <br />425-1-521 INLETS DT BOT TYPE C <10' FDOT NON -PART <br />EA <br />5 <br />3,200.00 <br />16 000.00 <br />WCDO14197- <br />1 B ROAD <br />425-531 INLETS DT BOT TYPE C MOD <10' FDOT NON PART <br />EA <br />2 <br />3,250.00 <br />6,500.00 <br />WCDO14 198- <br />1 B ROAD <br />425-1-541 INLETS DT BOT TYPED <10' FDOT NON -PART <br />EA <br />4 <br />3.950.00 <br />15 800.00 <br />WCDO14 205- <br />1 B ROAD <br />425-2-61 MANHOLES (P -8)(<l 0FDOT NON -PART <br />EA <br />2 <br />4,600.00 <br />9,200.00 <br />WCDO14 207- <br />1 B ROAD <br />425-2-72 MANHOLES J-7 >10' FDOT NON -PART <br />LF <br />1 <br />13 500.00 <br />13 500.00 <br />WCDO14 208- <br />1 B ROAD <br />430-175-115 PIPE CULVERT RCP ROUND 15"SS FDOT NON <br />EA <br />65 <br />59.00 <br />3,835.00 <br />WCDO14 227- <br />1 B ROAD <br />430-982-123 MITERED END SECTION CONC) (15"CD) FDOT NON <br />EA <br />1 <br />1.417.00 <br />1,417.00 <br />WCDO15 <br />PRICE ADJ BITUMINOUS MAT'L FDOT PARTICIPATING <br />LS <br />1 <br />20 839.92 <br />20 839.92 <br />WCDO16 173- <br />1 B ROAD <br />120-1 REGULAR EXCAVATION - FDOT NON -PART <br />Cy <br />890 <br />3.50 <br />3,115.00 <br />WCDO16 NEW <br />PAY ITEM <br />LUMP SUM LABOR & EQUIP INSTALL TOE OF EACH PANEL ADDT <br />LS <br />1 <br />42 971.44 <br />42 971.44 <br />WCDO16 314 - <br />1B 61ST B <br />400-2-5 CONCRETE CALSS II SUBSTRUCTURE <br />LB <br />1 <br />1,260.00 <br />1,26 .00 <br />WCDO16 319 - <br />1 B 61ST B <br />415-1-5 REINFORCING STEEL - BRIDGE SUBSTRUCTURE <br />LS <br />8.064 <br />2.00 <br />16 128.00 <br />WCDO16 330- <br />16 65TH B <br />400-2-5A CONCRETE CLASS II SUBSTRUCTURE <br />Cy <br />1 <br />1,260.00 <br />1.260.00 <br />WCDO16 335- <br />1B 65TH B <br />415-1-5A REINFORCING STEEL - BRIDGE SUBSTRUCTURE <br />LB <br />8.064 <br />1.50 <br />12 096.00 <br />WCDO17 <br />RESET DRAINAGE STR SS-311A-FDOT NON PART <br />LS <br />1 <br />3,745.34 <br />3,745.34 <br />WCDO18 <br />ADJ FOR BITUMINOUS MAT'L 7/1/2022 -12/31/2022 FDOT PART <br />LS <br />1 <br />54 868.71 <br />54 868.71 <br />WCDO19 <br />700-2-12 MULTI -POST SIGN (F&I) (12-20SF FDOT NON -PART <br />EA <br />2 <br />4,400.00 <br />8,800.00 <br />FURNISH & INSTALL TWO LARGER PULL BOXES (17"X30") AT <br />WCD020 <br />57TH & 69TH - FDOT NON -PARTICIPATING <br />LS <br />1 <br />2,070.00 <br />2,070.00 <br />WCD023 054- <br />0522-2 SIDEWALK CONCRETE 6" THICK FDOT NON <br />1A ROAD <br />PARTICPATING <br />SY <br />1 2,390 <br />38.25 <br />91 428.21 <br />WCD023 235- <br />1 B ROAD <br />0522-2 SIDEWALK CONCRETE, 6" THICK FDOT NON <br />PARTICIPATING <br />SYS <br />2 096 <br />1 38.25 <br />80 168.94 <br />WCD024 <br />0536-73 GUARDRAIL REMOVEL - FDOT NON PARTICIPATING <br />EA <br />1.176 <br />5.00 <br />5.880.00 <br />WCD025 <br />ADJ FOR BITUMINOUS MAT'L 1/1/2023 - 3/31/2023 FDOT PART <br />LS <br />1 <br />10 951.86 <br />10 951.86 <br />ABANDON EXISTING WELL AT STA 392+24,16' RT (65TH ST <br />WCD027 <br />INTERSECTION) FDOT NON -PARTICIPATING <br />LS <br />1 <br />7568.46 <br />7.568.45 <br />PERFORM THERMAL INTEGRITY PROFILING (TIP) TESTING OF <br />DRILLED SHAFT #4 AT THE SW CORNER OF 57TH ST & 66TH <br />WCD028 <br />AVE <br />LS <br />1 <br />2083.73 <br />2.083.73 <br />INCORPORATE PLAN REVISION #19 BRIDGE WHICH <br />DECREASED THE WIDTH OF THE CORNER ABUTMENT PANELS <br />WCD029 <br />61ST & 65TH STREET BRIDGES <br />LS <br />1 1 <br />11 598.37 <br />11 598.37 <br />REIMBURSEMENT OF IDLE EQUIPMENT AT 61ST ST BRIDGE <br />WCD030 <br />WHILE RECASTING 4 NEW CORNER PANELS <br />LS <br />1 <br />49 699.20 <br />49 699.20 <br />RELOCATE PREVIOUSLY PLACED DRAINAGE STRUCTURE SS- <br />WCD031 <br />329 AND 32 LF 18" RCP AT ST 206+80 <br />LS <br />1 <br />3,686.93 <br />3,686.93 <br />REGRADE ALONG 66TH AVE BETWEEN STA 329+00 AND 338+00 <br />WCD032 <br />TO ADD A SWALE DITCH AND INSTALL ADDED DBI <br />LS <br />1 <br />27 928.96 <br />27 928.96 <br />RE -GRADE TO REVISED EP ELEVATION IN PLAN REVISION i , <br />WCD033 <br />SHEFT k Qm3j7PPImr nivininNPPn.IFCT.%%Ign."6th Ave WideninLt <br />rv_LmwGWG92, <br />up <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.