66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET)
<br />PROJECT NO. IRC -1505 BID NO. 2021018
<br />.ItdrTi,Nb'
<br />D, !ufiii,,
<br />Quanta
<br />ic, 6edwa�61,
<br />WCD034
<br />HURRICANE PREPAREDNESS FOR TROPICAL STORM NICOLE
<br />LS
<br />1
<br />2,590.13
<br />2,590.13
<br />WCD035
<br />ADJ FOR BITUMINOUS MATT 4/110223 TO 6/30/2023 FDOT PART
<br />LS
<br />1
<br />10,792.62
<br />10,792.62
<br />WCD036
<br />EXTEND THE LIMITS OF THE DITCH LINING AT THE NR CANAL
<br />BRIDGE FROM 25' OUTSIDE THE BRIDGE EASTWARD
<br />LS
<br />1
<br />55 767.85
<br />55,767.85
<br />WCD038
<br />ADJ FOR BITUMINOUS MATT 7/1/2023- 9/30/2023
<br />LS
<br />1
<br />25,488.57
<br />25,488.57
<br />WCD039
<br />DELIVERY OF DRAINAGE STRUCTURES S-857 & EX -1 TO
<br />COUNTY MAINTENANCE YARD
<br />LS1
<br />1
<br />6,846.44
<br />6,846.44
<br />6" GRANULAR SUBBASE IN LIEU OF 12" TYPE B STABILIZATOIN
<br />WCD040
<br />FOR 300 LF 53RD ST WEST
<br />LS
<br />1
<br />5,046.28
<br />5,046.28
<br />WCD041
<br />CONSTRUCT CURVED BARRIER WALL TO THE SW QUADRANT
<br />OF 53RD ST BRIDGE PER PLAN REV #7
<br />Ls
<br />1
<br />90,816.88
<br />90,816.88
<br />WCD042
<br />ICONSTRUCT UTILITY PIPE CRADLES AS SHOWN IN EXHIBIT
<br />LS
<br />1
<br />74,56
<br />20,794.56
<br />0
<br />20,794.56
<br />WCD043
<br />CONSTRUCT CURVED BARRIER WALL TO SW QUADRANT OF
<br />57TH ST BRIDGE PER PLAN REV 415
<br />LS
<br />1
<br />5 167 . 3 1
<br />105167.31
<br />0
<br />F2
<br />105,167.31
<br />WCD044
<br />CONSTRUCT CURVED BARRIER WALL TO NW & SW
<br />QUADRANTS OF BRIDGE AT 61 ST & 65TH STREETS
<br />LS
<br />1
<br />322,502.83
<br />322,502.83
<br />WCD045
<br />067 - 1A Road 0570 1 1 - PERFORMANCE TURF, SOD 1 - BAHIA
<br />SHY
<br />�0
<br />14680
<br />3.00
<br />44.040.00
<br />WCD045
<br />251 -1 B Road 570-1-2A- PERFORMANCE TURF (SOD) (BAHIA)
<br />SY
<br />16.315
<br />3.00
<br />49,065.00
<br />WCD046
<br />ADJ FOR BITUMINOUS MATT 6/1 - 6/30 THAT WAS LEFT OFF
<br />WCD035
<br />LS
<br />1
<br />1,774.40
<br />1,774.40
<br />WCD047
<br />PERFORM THERMAL INTEGRITY PROFILING (TIP) TESTING OF
<br />DRILLED SHAFT B AT 53RD ST INTERSECTION
<br />LS
<br />1
<br />2,607.41
<br />2,607.41
<br />PLACE 6" GRANULAR SUBBASE IN LIEU OF 12" TYPE B
<br />WCD048
<br />STABILIZATION FROM STA 185+00 TO 195+00 AND STA0195+00
<br />ITO 200+00 ON 69TH ST WEST (ABOUT 6.667LS
<br />1
<br />22,195.81
<br />22,195.81
<br />PLACE 6" GRANULAR SUBBASE IN LIEU OF PE B
<br />WCD049
<br />STABILIZATION FROM STA 208+66 TO 211+66 (AVG WIDTH 32')
<br />ON 65TH STREET
<br />LS
<br />1
<br />6,379.05
<br />6,379.05
<br />CONSTRUCT AERIAL WATER MAIN CROSSING OVER NRC
<br />WCD050
<br />BRIDGE
<br />LS
<br />1 _
<br />53.921.26
<br />53,921.26
<br />WCD051
<br />EXTEND THE HEIGHT OF SS -323 HEADWALL BY 3.8 FEET PER
<br />I REVISION #24 PHASE I B
<br />LS
<br />1
<br />19,328.48
<br />19328.48
<br />IMPLEMENT 53RD STREET BRIDGE PLAN REVISION #1 THAT
<br />REMOVED 36" SINGLE SLOPE TRAFFIC RAIL AND REPLACED
<br />WCD052
<br />W/9'-4" RAISED SIDEWALK
<br />LS
<br />1
<br />31,144.36
<br />31,144.36
<br />WCDO53
<br />APPLY CLASS 5 APPLIED FINISH COATINGS PER SECTION 976
<br />TO ROADWAY BARRIER WALLS
<br />LS
<br />1
<br />9,628.13
<br />9,628.13
<br />REGRADE & RESET FORMS FOR WESTERN APPROACH SLAB
<br />WCD054
<br />AT 57TH ST BRIDGE IN RESPONSE TO RFI 74
<br />LS
<br />1
<br />9,372.30
<br />9,372.30
<br />REVISE THE SWALE ON 61 ST ST PER PLAN REV #22 TO
<br />WCD055
<br />COLLECT STORMWATER BETWEEN STA 205+00 & 208+00
<br />LS
<br />1
<br />7,657.46
<br />7,657.46
<br />WCD056
<br />MODIFY S-1605 ON 57TH ST TO ACCOMMODATE HISTORIC
<br />DRAINAGE FORM FIELD TO THE NORTH
<br />LS
<br />1
<br />5,487.98
<br />5487.98
<br />WCDO57
<br />HURRICANE PREPAREDNESS FOR HURRICANE [AN
<br />LS
<br />1
<br />6,403.12
<br />6,403.12
<br />PLACE 6" GRANULAR SUBBASE IN LIEU OF 12" TYPE B
<br />WCDO58
<br />STABILIZATION ALONG 53RD ST WEST (APPROX 5187 S
<br />LS
<br />1
<br />58,532.89
<br />58,532.89
<br />WCDO59
<br />ABANDON EXISTING WELL ON 65TH ST EAST (ST 311+30.8,3.2'
<br />LT, TOP ELEV 19.55
<br />LS
<br />1
<br />10,222.88
<br />1022288
<br />WCD060
<br />REIMBURSEMENT RAW MATERIAL PRICE INCREASE FOR
<br />WCD023 (FEBRUARY 2021)
<br />SY
<br />4,486
<br />20.55
<br />92,191.41
<br />WCDO61
<br />ADJ FOR BITUMINOUS MAT'L - 1/2024 - 3/2024
<br />LS
<br />1
<br />27,362.76
<br />27,362.76
<br />WCD062
<br />RESET DRAINAGE STIR SS -216 INLET TOP
<br />LS
<br />1
<br />3,451.15
<br />3,451.15
<br />WCD063
<br />CONSTRUCT 69TH ST WEST AS SHOWN IN PLAN REV 29
<br />LS
<br />1
<br />51,357.05
<br />51,357.05
<br />WCD064
<br />ABANDON IN[PLACE & FILL PARTIALLY INSTALLED PIPE RUNS
<br />ON 69TH ST WEST W/NON-EXCAVATABLE FLOWABLE FILL
<br />LS
<br />1
<br />20.218.94
<br />2021894
<br />WC.'D065
<br />ADJ FOR BITUMINOUS MAT'L 4/1/2024 - 6/30/20204
<br />LS
<br />1
<br />84.970.01
<br />84,9701
<br />7
<br />RlioublicWorkskENGINEERING DIVISION PROJECTS\1505-66thAW Widenilng_49thSt to 69th SM-Adn-WAgencla ItemlProject CloseoLAXWORKING FOLDER\IRC-1505_DESC OF CFIGS CO 1