My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-147
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:33:18 PM
Creation date
7/28/2025 1:32:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/15/2025
Control Number
2025-147
Agenda Item Number
9.D.
Entity Name
Haley Engineering Contractors, Inc.
Subject
Change Order No. 4 for Final Payment, Release of Retainage for Construction of 66th Ave Road
Widening (49th Street to 69th Street),
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) <br />PROJECT NO. IRC -1505 BID NO. 2021018 <br />tem No.. <br />Descn tion <br />Unit <br />Quantity <br />Pricecrease , <br />Umt Price- Price Increase , , e D <br />_ <br />REMOVE AND DISPOSE 2 DBIS AT APPROX STA297+53.50RT <br />WCD066 <br />AND STA300+53RT <br />LS <br />1 <br />23 565.17 23 565.17 <br />REIMBURSE CONTRACTOR FOR GUARDRAIL PRICE INCREASE <br />WCD067 <br />AND ADDT 6 ITEM 536-8 EOR REVISION <br />LS <br />1 <br />41 975.00 41 975.00 <br />WCD069 <br />REPLACE 1 000'ROCK BASE WITH ASPHALT BASE FULL WIDTH <br />LT ROADWAY FROM STA 367+10 TO STA 377+10 <br />LS <br />1 <br />417 155.16 417 155.16 <br />DIRECTIONAL BORE UNDER SOUTHBOUND 66TH AVE AND <br />INSTALL A 2" CONDUIT TO PASS THE ELECTRIC WIRES FROM <br />WEST SIDE WHERE FPL POWER AVAILABLE FOR IRRIGATION <br />WCD070 <br />PUMPS <br />LS <br />1 <br />5,453.38 5,453.38 <br />WCD071 <br />RELOCATE DRAINAGE STRUCTURE SS -314 AND PERFORM ALL <br />WORK ASSOCIATED WTH PLAN REVISION 32 <br />LS <br />1 <br />16 308.21 16 308.21 <br />WCD072 <br />SILT FENCE <br />LS <br />1 <br />6,768.81 6,768.81 <br />F&I SIDEWALK PLATES AT THE OPEN JOINTS ON THE 53RD ST <br />WCD073 <br />BRIDGE <br />LS <br />1 <br />8,786.98 8,786.98 <br />WCD074 <br />ADJ BID UNIT PRICE FOR BITUMINOUS MATERIAL JULY 1, 2024 - <br />SEPT 30 2024 <br />LS <br />1 <br />52 380.08 52 380.08 <br />WCD075 <br />HURRICANE MILTON PREPAREDNESS MEASURES <br />LS <br />1 <br />5,336.55 5,336.55 <br />WCD076 <br />RELOCATE HEADWALL SS -220 AND REGRADE ADJACENT <br />SWALE ALONG 65TH STREET EAST PER PLAN REV #28 <br />LS <br />1 <br />5,659.00 5669.00 <br />WCD077 <br />PROVIDE A 12" WIDE SLOT AT ELEVATION 20.85 (APPROX 4") ON <br />THE EAST SIDE OF DRAINAGE STRUCTURE SS -329 <br />LS <br />1 <br />718.91 718.91 <br />F&I PEDESTRIAN HANDRAIL (PAY ITEM 515 1 2) AT FIVE <br />WCD079 <br />LOCATIONS AND LENGTHS AS SHOWN ON WCD079 TOTAL 45 <br />LF <br />LS <br />1 <br />3,053.44 3,053.44 <br />WCDO80 <br />INCORPORATE FDOT DCE MEMO 22-03 FOR STEEL GUARDRAIL <br />LS <br />1 <br />23 089.09 23 089.09 <br />CONSTRUCT DRIVEWAY ON 57TH ST PER PLAN REV 16 AND <br />WCDO82 <br />ADD RADIUS CURBS AT DRIVEWAY ON 69TH ST <br />LS <br />1 <br />10 190.36 10 190.36 <br />WCDO83 <br />REGRADE EMBANKMENT ON EAST SIDE OF NORTH RELIEF <br />CANAL AT LATERAL A CANAL <br />LS <br />1 <br />5,257.87 5,257.87 <br />EXTEND PROPOSED FIBER OPTIC WORK FROM NW CORNER <br />WCD084 <br />OF 66TH AVE AT 57TH ST TO STORM GROVE MIDDLE SCHOOL <br />LS <br />1 <br />7,592. 0 7 592.00 <br />WCD085 <br />COMPENSATE CONTRACTOR FOR MATERIALS UNUSED IN <br />MATERIAL DRAINAGE STRUCTURE S-412 <br />LS <br />1 <br />1,224.91 1,224.91 <br />ADJ BID UNIT PRICE FOR BITUMINOUS MATERIAL JULY 1, 2024 - <br />WCD086 <br />SEPT 30 2024 <br />LS <br />1 <br />62 926.92 62 926.92 <br />WCDO88 <br />COMPENSATE CONTRACTOR FOR EXTENDED MOT & EROSION <br />CONTROL 354 DAYS <br />LS <br />1 <br />422 440.00 422 440.00 <br />WCDO89 <br />134 DAY NONCOMPENSABLE TIME FOR FPL DELAYS <br />LS <br />1 <br />0.00 0.00 <br />WCDO90 <br />FINAL FIBER OPTIC CONNECTION CHANGES <br />LS <br />1 <br />22 468.72 22 468.72 <br />F&I DUAL 6" UNDERDRAIN/INFILTRATION SYSTEM CONNECTING <br />WCD091 <br />TO STRUCTURE S-1508 <br />LS <br />1 <br />32 788.07 32 788.07 <br />WCDO92 <br />ADD'L PATCH PANEL AND SPLICES TO NEW FIBER OPTIC <br />NETWORK AT 57TH STREET <br />LS <br />1 <br />3 243.16 3,243.16 <br />WCDO93 <br />ADDITIONAL THERMOPLASTIC STRIPING FOR PH1A NOT <br />INCLUDED ON TABULATION OF QUANTITIES <br />LS <br />1 1 <br />6,864.00 6,864.00 <br />ADJUST THE ROADWAY SHOULDER ELEVATION TO MATCH <br />WCD095 <br />CURRENT ELEVATION OF ROADWAY ON 65TH STREET WEST <br />FROM STA 182+20 TO 184+20 <br />LS <br />1 <br />4,959.22 4,959.22 <br />003-1A ROAD <br />IRC 1 - FIELD OFFICE <br />LS1 <br />3 000.00 3,000.00 <br />008 - 1A Road <br />01204 -SUBSOIL EXCAVATION <br />CY <br />380 <br />22.00 8,360.00 <br />010 - 1A Road <br />0120 6 - EMBANKMENT COMPACTED IN PLACE <br />CY <br />2 669 <br />7.50 20 017.50 <br />011 -1A Road <br />012170 - FLOWABLE FILL <br />CY <br />100 <br />170.00 17 000.00 <br />012 - 1A Road <br />0160 4 - TYPE B STABILIZATION <br />SY <br />894 <br />2.70 2,413.80 <br />013 - 1A Road <br />285709 - OPTIONAL BASE BASE GROUP 09 <br />SY <br />699 <br />13.00 9 087.00 <br />F1Pub6c Works\ENGINEERING DIVISION PROJECTSM05-66th Ave Wdening_49th Sl to 69th Stll-Adn inlAgenda Ite=\Profecl CloseoLMORKING FOLDERVRC-1505_DESC OF CHCS CO 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.