Laserfiche WebLink
66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) <br />PROJECT NO. IRC -1505 BID NO. 2021018 <br />tem No.. <br />Descn tion <br />Unit <br />Quantity <br />Pricecrease , <br />Umt Price- Price Increase , , e D <br />_ <br />REMOVE AND DISPOSE 2 DBIS AT APPROX STA297+53.50RT <br />WCD066 <br />AND STA300+53RT <br />LS <br />1 <br />23 565.17 23 565.17 <br />REIMBURSE CONTRACTOR FOR GUARDRAIL PRICE INCREASE <br />WCD067 <br />AND ADDT 6 ITEM 536-8 EOR REVISION <br />LS <br />1 <br />41 975.00 41 975.00 <br />WCD069 <br />REPLACE 1 000'ROCK BASE WITH ASPHALT BASE FULL WIDTH <br />LT ROADWAY FROM STA 367+10 TO STA 377+10 <br />LS <br />1 <br />417 155.16 417 155.16 <br />DIRECTIONAL BORE UNDER SOUTHBOUND 66TH AVE AND <br />INSTALL A 2" CONDUIT TO PASS THE ELECTRIC WIRES FROM <br />WEST SIDE WHERE FPL POWER AVAILABLE FOR IRRIGATION <br />WCD070 <br />PUMPS <br />LS <br />1 <br />5,453.38 5,453.38 <br />WCD071 <br />RELOCATE DRAINAGE STRUCTURE SS -314 AND PERFORM ALL <br />WORK ASSOCIATED WTH PLAN REVISION 32 <br />LS <br />1 <br />16 308.21 16 308.21 <br />WCD072 <br />SILT FENCE <br />LS <br />1 <br />6,768.81 6,768.81 <br />F&I SIDEWALK PLATES AT THE OPEN JOINTS ON THE 53RD ST <br />WCD073 <br />BRIDGE <br />LS <br />1 <br />8,786.98 8,786.98 <br />WCD074 <br />ADJ BID UNIT PRICE FOR BITUMINOUS MATERIAL JULY 1, 2024 - <br />SEPT 30 2024 <br />LS <br />1 <br />52 380.08 52 380.08 <br />WCD075 <br />HURRICANE MILTON PREPAREDNESS MEASURES <br />LS <br />1 <br />5,336.55 5,336.55 <br />WCD076 <br />RELOCATE HEADWALL SS -220 AND REGRADE ADJACENT <br />SWALE ALONG 65TH STREET EAST PER PLAN REV #28 <br />LS <br />1 <br />5,659.00 5669.00 <br />WCD077 <br />PROVIDE A 12" WIDE SLOT AT ELEVATION 20.85 (APPROX 4") ON <br />THE EAST SIDE OF DRAINAGE STRUCTURE SS -329 <br />LS <br />1 <br />718.91 718.91 <br />F&I PEDESTRIAN HANDRAIL (PAY ITEM 515 1 2) AT FIVE <br />WCD079 <br />LOCATIONS AND LENGTHS AS SHOWN ON WCD079 TOTAL 45 <br />LF <br />LS <br />1 <br />3,053.44 3,053.44 <br />WCDO80 <br />INCORPORATE FDOT DCE MEMO 22-03 FOR STEEL GUARDRAIL <br />LS <br />1 <br />23 089.09 23 089.09 <br />CONSTRUCT DRIVEWAY ON 57TH ST PER PLAN REV 16 AND <br />WCDO82 <br />ADD RADIUS CURBS AT DRIVEWAY ON 69TH ST <br />LS <br />1 <br />10 190.36 10 190.36 <br />WCDO83 <br />REGRADE EMBANKMENT ON EAST SIDE OF NORTH RELIEF <br />CANAL AT LATERAL A CANAL <br />LS <br />1 <br />5,257.87 5,257.87 <br />EXTEND PROPOSED FIBER OPTIC WORK FROM NW CORNER <br />WCD084 <br />OF 66TH AVE AT 57TH ST TO STORM GROVE MIDDLE SCHOOL <br />LS <br />1 <br />7,592. 0 7 592.00 <br />WCD085 <br />COMPENSATE CONTRACTOR FOR MATERIALS UNUSED IN <br />MATERIAL DRAINAGE STRUCTURE S-412 <br />LS <br />1 <br />1,224.91 1,224.91 <br />ADJ BID UNIT PRICE FOR BITUMINOUS MATERIAL JULY 1, 2024 - <br />WCD086 <br />SEPT 30 2024 <br />LS <br />1 <br />62 926.92 62 926.92 <br />WCDO88 <br />COMPENSATE CONTRACTOR FOR EXTENDED MOT & EROSION <br />CONTROL 354 DAYS <br />LS <br />1 <br />422 440.00 422 440.00 <br />WCDO89 <br />134 DAY NONCOMPENSABLE TIME FOR FPL DELAYS <br />LS <br />1 <br />0.00 0.00 <br />WCDO90 <br />FINAL FIBER OPTIC CONNECTION CHANGES <br />LS <br />1 <br />22 468.72 22 468.72 <br />F&I DUAL 6" UNDERDRAIN/INFILTRATION SYSTEM CONNECTING <br />WCD091 <br />TO STRUCTURE S-1508 <br />LS <br />1 <br />32 788.07 32 788.07 <br />WCDO92 <br />ADD'L PATCH PANEL AND SPLICES TO NEW FIBER OPTIC <br />NETWORK AT 57TH STREET <br />LS <br />1 <br />3 243.16 3,243.16 <br />WCDO93 <br />ADDITIONAL THERMOPLASTIC STRIPING FOR PH1A NOT <br />INCLUDED ON TABULATION OF QUANTITIES <br />LS <br />1 1 <br />6,864.00 6,864.00 <br />ADJUST THE ROADWAY SHOULDER ELEVATION TO MATCH <br />WCD095 <br />CURRENT ELEVATION OF ROADWAY ON 65TH STREET WEST <br />FROM STA 182+20 TO 184+20 <br />LS <br />1 <br />4,959.22 4,959.22 <br />003-1A ROAD <br />IRC 1 - FIELD OFFICE <br />LS1 <br />3 000.00 3,000.00 <br />008 - 1A Road <br />01204 -SUBSOIL EXCAVATION <br />CY <br />380 <br />22.00 8,360.00 <br />010 - 1A Road <br />0120 6 - EMBANKMENT COMPACTED IN PLACE <br />CY <br />2 669 <br />7.50 20 017.50 <br />011 -1A Road <br />012170 - FLOWABLE FILL <br />CY <br />100 <br />170.00 17 000.00 <br />012 - 1A Road <br />0160 4 - TYPE B STABILIZATION <br />SY <br />894 <br />2.70 2,413.80 <br />013 - 1A Road <br />285709 - OPTIONAL BASE BASE GROUP 09 <br />SY <br />699 <br />13.00 9 087.00 <br />F1Pub6c Works\ENGINEERING DIVISION PROJECTSM05-66th Ave Wdening_49th Sl to 69th Stll-Adn inlAgenda Ite=\Profecl CloseoLMORKING FOLDERVRC-1505_DESC OF CHCS CO 1 <br />