My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-131
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 10:43:14 AM
Creation date
8/5/2025 10:42:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/17/2025
Control Number
2025-131
Agenda Item Number
9.L.
Entity Name
Johnson, Mirmiran & Thompson
Subject
Engineering Services Work Order 01 for Engineering and Design of 32nd Ave,
43rd PL and 44th Street Gifford Neighborhood
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES FOR ENGINEERING CONSULTING SERVICES <br />This Exhibit forms, an integral part of the agreement between Indian River County (hereinafter referred to <br />as the COUNTY) and Johnson, Mirmiran & Thompson (hereinafter referred to as the CONSULTANT) <br />relative to the transportation facility described as follows: <br />I. PROJECT TITLE <br />Professional Engineering Services for the Construction of Pavement on 32nd Ave, 43rd Place, and 44th <br />St. <br />H. OBJECTIVE <br />The purpose of this project is to develop construction plans for the construction of pavement and <br />drainage facilities along 550' of 32nd Ave (from of 43rd St to 44th St); 310' of 43rd PI (from 33rd <br />Ave to 32nd Ave); and 260' of 44th St (from 32nd Ave to 31st Ave); see Figure 1 below. <br />Figure 1— Project Limits <br />III. PROJECT DESCRIPTION <br />A complete set of bid documents will be developed for the unpaved roadways of 32nd Ave (from of <br />43rd St to 44th St), 43rd PI (from 33rd Ave to 32nd Ave), and 44th St (from 32nd Ave to 31st Ave) <br />to construct new asphalt pavement and associate drainage facilities. The COUNTY will provide any <br />survey already obtained for the project location. <br />IV. PROJECT SCOPE OF WORK <br />1. Proiect General: <br />• Contract Maintenance and Project Documentation— Includes document management, schedule <br />updates, progress Reports <br />• Client/Progress Meetings — Includes two one-hour meetings per month <br />• Field Reviews — Includes one field review (two attendees) <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.