Laserfiche WebLink
• Coordination — Required for collaborating withgeotechnical professional for design parameters <br />• Development'of Project Specifications <br />• Development of Project Cost Estimates — Includes one cost estimate for each submittal phase <br />2. Roadway Design: <br />• Master Design File Setup & Maintenance, Model Management Plan — Includes initial <br />CADD file setup for files needed for plan development <br />• HorizontalNertical Master Design Files/31) Geometrics.— Approximately 0.25 miles of <br />project length along 32"d Ave, 43' Pl, and 44`h St <br />• Temporary Traffic Control Plans Phasing/Analysis — Development of TTCP concept and <br />reference files for quantities <br />• Quantities <br />• QA/QC <br />3. Roadway Plans/Deliverables: <br />• Key Sheet/Signature Sheet <br />• Typical Section and Paving Details Sheet <br />• General Notes Sheet <br />• Project Layout Sheet <br />• Plan/Profile Sheets (including Signing and Pavement Markings, and Utilities) <br />• Temporary Traffic Control Plans Sheets — General TTCP notes, phasing notes and typical <br />sections, detour sheet <br />• Standard Details (from FDOT Standard Plans) <br />• Summary of Quantities Tables/Sheets <br />• QA/QC <br />• Supervision <br />4. Drainage Design <br />• Delineate Drainage Area <br />• Calculations — Rational Method for runoff calculations <br />• Storm Drain Design — Design inlets and size storm drains. The likely outlet will be an <br />existing ditch west of 33rd Ave, which then drains north and ties into the IRFWCD lateral <br />connector under 45th Street. <br />• Quantities <br />• QA/QC <br />• Supervision <br />5. Drainage Plans/Deliverables <br />• Conceptual Drainage Memo — Includes all calculations <br />• Drainage Structures Sheets (Cross Sections) — see Note 5-1 below <br />• Optional Materials Sheet — see Note 1 below <br />• Standard Details (from FDOT Standard Plans) <br />• Summary of Quantities Tables/Sheets <br />• QA/QC <br />• Supervision <br />• NOTE 5-1: For this scope of service, it is assumed that no stormwater attenuation or <br />treatment design is necessary. Should stormwater attenuation and treatment be required, a <br />scope amendment will be provided. <br />o IRFWCD: A 2003 memorandum with the Indian River Farms Water Control <br />Page 4 of 7 <br />