My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-158
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 2:43:40 PM
Creation date
9/11/2025 2:42:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/19/2025
Control Number
2025-158
Agenda Item Number
9.Q.
Entity Name
CPZ Architects, Inc.
Subject
Architecture Services Work Order 3 for IRC Administration Bg. B 2nd Floor West Side Office Build Out
– Human Resources
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMTA <br />Building Science Leadership <br />• IT Design for Telecom/Data Device Locations, Back Boxes and Cable <br />Routing to Headend Room. Includes up to 2 IT Design Meetings, as <br />required. <br />• Design modification to the existing Fire Alarm System. <br />• Coordination with Specialty Equipment Vendors, Cut Sheets. <br />Plumbing Design: <br />• Design for domestic water and sanitary sewer to support new restroom and <br />breakrooms, if required. <br />Fire Protection Design: <br />Fire Sprinkler Head Adjustments to support the new floor plan. <br />Scope of Services: <br />Our Scope of Work and Services will include the following: <br />1. All Design Team Meetings, via Teams. <br />2. Electrical Specifications and Construction Documents (Revit (BIM) or <br />AutoCAD). <br />3. Design Documents, Reviews and Responses for: <br />• Construction Documents <br />• Permitting <br />• Bid Assistance <br />• Construction Administration - Responses to Contractor RFI's, Shop <br />Drawing Review (No More Than 2 Reviews) and up to 3 Site <br />Visits/Meetings for Observation of Work. <br />Compensation for Services: <br />Our base design fee for this new project will be Thirty -Five Thousand Nine <br />Hundred Ten Dollars ($35,910.00) plus customary reimbursable expenses. <br />We would anticipate our billing schedule would be as follows: <br />• Schematic Design & Existing Conditions $ 3,505.00 <br />• Design Development $ 4,365.00 <br />• Construction Drawings $12,480.00 <br />• Permitting $ 3,060.00 <br />• Bidding $ 1,720.00 <br />• Construction Administration $10,780.00 <br />CMTA Maitland Office <br />600 South Maitland Avenue I Maitland, FL 132751 <br />MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning <br />
The URL can be used to link to this page
Your browser does not support the video tag.