Laserfiche WebLink
00 0.0 <br />CMTA <br />Reimbursable Expenses: <br />Building Science Leadership <br />Printing/Reproduction and Methods of Delivery to be Billed at Direct Cost. We <br />estimate reimbursables to be $250.00. <br />Additional Expenses / Excluded Items: <br />Services required beyond basic scope shall be negotiated on an as needed basis <br />at which time a proposal for additional services will be provided. <br />• Building Floor Plan Changes (Flip and Rotation) <br />• Commissioning <br />• Construction Administration <br />• Contractor As-Builts <br />• LEED Assistance / Energy Modeling <br />• Prototype Reuse <br />• Rational Analysis <br />• Value Engineering <br />Terms and Conditions: <br />CMTA, will perform the Scope of Work as outlined above for a base fee for design <br />and permitting for $35.910.00 monthly invoices will be submitted based upon <br />percent complete and are due upon receipt. Accounts unpaid for 45 days from the <br />date of invoice are subject to a 1.5 percent per month service charge. Accounts <br />unpaid for 75 days from the date of invoice will be a cause to suspend all <br />performance under this Agreement. In the event of a suspension of services, <br />CMTA, shall have no liability for any delay or other damage, contractual or <br />otherwise, caused by or arising out of the suspension of services of nonpayment. <br />Acceptance of any payment more than 75 days old shall not serve as a waiver of <br />CMTA's contractual right to suspend service for nonpayment. Exhibit A "General <br />Terms and Conditions" attached to this proposal is a part of this agreement. <br />Limits of BIM/Revit Design: <br />CMTA design standard for Revit is limited to Level of Development (LOD) 300. <br />• LOD 300 - The Model Element is graphically represented within the Model <br />as a specific system, object or assembly in terms of quantity, size, shape, <br />location, and orientation. <br />• Non -graphic information may also be attached to the Model Element. <br />• Coordination without clash detection software will be focused on major hard <br />clashes, major equipment layout and standard level of coordination to <br />CMTA Maitland Office <br />600 South Maitland Avenue I Maitland, FL 132751 <br />MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning <br />