Laserfiche WebLink
PROJECTED SCHEDULE FOR ENGINEERING DESIGN SERVICES: <br />PROJECT SCHEDULE FOR ENGINEERING SERVICES: <br />(COMMENCEMENT UPON RECEIPT OF NOTICE TO PROCEED) <br />MAJORTASKS <br />PHASE <br />Survey held work <br />Survey drawing preparation <br />Drainage Study <br />Conceptual plans prep (30%) <br />30% Plans Review by County <br />HASE2 <br />60% DESIGN DEVELOPMENT <br />Address 30% review comments <br />Prepare 60% design development plans <br />60% Plans Review by County <br />Permitting <br />90% DESIGN DEVELOPMENT <br />Address 60% review comments <br />Prepare 90% design development plans <br />Prepare 90% Construction cost estimate <br />90% Plans Review by County <br />100% DESIGN DEVELOPMENT <br />Address 90% review comments <br />Prepare 100% construction plans <br />Praparel00% Construction cost estimate <br />PHASE 3 <br />Bidding <br />Construction <br />WEMS <br />1 3 3 4 1111 9 10 11 12 10 14 X5 16 17 18 19 20 71 22 23 24 15 26 27 28 29 20 21 22 23 24 25 36 37 38 39 !0 �1 42 43 u 45 6 !7 48 49 50 57 52 <br />il <br />continues.., <br />