Laserfiche WebLink
20th Avenue Sidewalk 8th Street to 12th Street - IRC Project No. 2508 <br />n u <br />Carter Associates, Inc. Fee Estimate 06/06/2025 <br />$195.00 <br />$175.00 <br />$115.00 <br />$120,00 <br />$IRi.00 <br />$140.00 <br />$175.00 $125.00 <br />Eng Principal <br />Eng.1 <br />Fag V <br />Eng CAD •tech III <br />Sin Principal <br />Surveyor 11 <br />3-Man Sur crew Sur GIS Tech II <br />'Sub-Consultant <br />Subtotal <br />Phase 1 <br />A. Survey <br />Field Work <br />131 <br />522.925.00 <br />Office Work <br />22 <br />32 <br />98 <br />$20.300.00 <br />B. Drainage Study <br />8 <br />40 <br />40 <br />8 <br />$14,120.00 <br />C.Conceptual Desi 30%) <br />48 <br />40 <br />30 <br />(ill <br />$32,760.00 <br />Phase 2 <br />A. Design Development 60, 90 & 100%) <br />40 <br />60 <br />120 <br />100 <br />$44,100.00 <br />Pedestrian CrosswalkSignalization <br />S12 00.00 <br />SI^_,600.00 <br />20th Avenue/12th Street Intersection Lighting <br />$IO 00.00 <br />$10.200.00 <br />B. Permitting <br />2 <br />8 <br />4 <br />S'' 2)50.00 <br />Phase 3 <br />A. BiddinF <br />2 <br />8 <br />4 <br />$2.270.00 <br />B. Construction Admin <br />20 <br />10 <br />24 <br />24 <br />$11.290.00 <br />Pedestrian Crosswalk Signalization /Intersection Lighting <br />$2,000.00 <br />S2 0110.00 <br />Total Manhours <br />98 <br />148 <br />244 <br />168 <br />22 <br />32 <br />131 98 <br />Total Fee Estimate <br />Tubd <br />$175,315.00 <br />Reimbursable <br />$1,000.00 <br />GRAND TOTAL <br />$176,315.00 <br />*Note; eeoestnan crosswatK sipalizatton ano Intersection ligllnng will be Ilanoleo by our LJA oince In UrlanoD. <br />