Laserfiche WebLink
CCNA2023 WORK ORDER 06 <br />Bowman Consulting Group, LTD. <br />Lift Station 201 Replacement <br />SCOPE OF SERVICES <br />Bowman Consulting Group Ltd. (Bowman) is pleased to submit this proposal for professional engineering <br />services to Indian River County Department of Utility Services (Utilities) for "Lift Station 201 Replacement." The <br />subject lift station is located at 1606 Indian River Drive, Sebastian. Utilities intends to construct a replacement <br />lift station on the west side of Indian River Drive, re-route the gravity sewer, and abandon the existing lift <br />station. <br />We propose to provide the following services: <br />Task 1— Conceptual Design <br />The new lift station will require an easement over the subject property, and an open -cut crossing of Indian River <br />Drive. Bowman will provide an exhibit to illustrate the proposed work and attend meetings with the roadway <br />authority and property owner. Preparation of the easement documents, including sketch and legal description, <br />will be the responsibility of Utilities. <br />Deliverables <br />• Exhibit of Proposed Work (Conceptual Plan) <br />Task 2 — Engineering Design <br />Bowman will prepare engineering design plans and lift station report to support the permitting and construction <br />a lift station at the southeast corner of 1615 Indian River Drive. The engineering plans will also illustrate the <br />modifications to the existing sanitary collection system required to route flow to the new lift station. The <br />existing force main along the west side of Indian River Drive will be relocated to allow installation of the <br />proposed terminal manhole. <br />Construction plans, lift station report, and opinion of probable construction cost will be submitted for Utilities <br />staff review at the 90% level. The final construction plans will reflect staff comments. <br />Deliverables <br />• Construction Plans, including plan, sewer profile, lift station plan and section, and utility details (90% <br />and Final); <br />• Lift Station Design Report (90% and Final); and <br />• Opinion of Probable Construction Cost (90% and Final). <br />Task 3 - Permitting <br />Using the documents produced in Task 1 Bowman will apply for the following required permits: <br />1. City of Sebastian Right of Way; and <br />2. Florida Department of Environmental Protection (FDEP) Wastewater Construction General Permit. <br />Bowman will address reasonable agency comments as part of this task. <br />