Laserfiche WebLink
9.2.2 Contractor shall maintain the following electronic records/logs in Microsoft Excel or similar <br />accounting software format approved by SWDD. These records shall be reported to SWDD <br />prior to the fifteenth (15th) Day of the month on services conducted the prior month. <br />a) Equipment Maintenance Log— Record of all maintenance activities performed during <br />the reporting month. <br />b) Transport Log — Quantity and type of materials collected and/or delivered to the <br />Designated Facility, identified by CCC during the reporting month. <br />c) Customer Log — Based on the Driver's License Software, the Contractor shall provide <br />a total number of individual customers visiting each CCC with a daily breakdown of <br />the reporting month. The Contractor shall also provide the total number of out -of - <br />county customers that were turned away. <br />d) Personnel Log — Employee names, position/title, and contact information. Personnel <br />Log shall also include contact information for any subcontractors, or subcontractor <br />employees, performing services required herein. <br />9.2.3 Transport of all materials collected to the Landfill or designated facility defined by SWDD, <br />as well as proper processing/packaging of HHW materials to be collected at the CCCs by a <br />separate SWDD vendor. The Contractor is responsible for coordinating with SWDD vendor <br />for the collection and removal of HHW materials. Additionally, all material manifest tickets <br />signed by the site attendant shall be returned to SWDD office within 2 (two) business Days. <br />9.2.4 The Contractor shall provide monthly reports to SWDD concerning the Contractor's <br />performance under this Agreement. At a minimum, the reports shall discuss the key events <br />that occurred after the last report, plus any key events that are anticipated during the next <br />month. Each report shall address: (a) any complaints received by the Contractor from the <br />public or the County (and how the complaints were satisfied); (b) any spills or emergencies; <br />or (c) accidents or injuries in transit, or at the CCCs. The Contractor will also provide SWDD <br />with an accident report for any accidents or injuries in transit or at the CCCs within 24 hours <br />of the incident detailing the time, location, nature of the incident, and all parties involved. <br />9.3 Operational Plans <br />9.3.1 Contractor shall be responsible for the development and updating of the following plans <br />over the Contract term: <br />a) Operations and Maintenance Plan. <br />b) CCC Equipment Plan meeting requirements set forth in Article 5.6. <br />c) CCC Health and Safety Plan meeting requirements set forth in Article 5.7. <br />d) Contingency and Continuity of Operations Plan meeting requirements set forth in <br />Article 13.1. <br />15 <br />ACTIVE:38438749.1 <br />