My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-183A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-183A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 12:56:31 PM
Creation date
10/6/2025 12:50:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/09/2025
Control Number
2025-183A
Agenda Item Number
13.L.2.
Entity Name
HDR Engineering, Inc.
Subject
Amendment 1 to Agreement for Integrated Water Master Plan for Scope of Services for
Wabasso Bridge Reuse Main Condition Assessment , RFQ 2024039
Project Number
IRCDUS 31.24.509
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTANT will utilize a boom truck within FDOT right-of-way to allow CONSULTANT staff to <br />conduct visual and BEM inspections of the reclaimed water mains. Appropriate maintenance of traffic <br />(MOT) and safety measures will be implemented to complete the work. <br />Scope of Services <br />Task 1 Project Management <br />CONSULTANT will set up, organize, manage, administer, and coordinate CONSULTANT activities <br />for this Project, including: <br />• Perform project initiation and project closeout tasks. <br />• Organize, manage, and coordinate staff required to accomplish this scope. <br />• Monitor scope, schedule, and budget throughout the project. <br />• Prepare for and submit monthly progress reports, summarizing completed tasks, next steps, <br />information needs, status update of active work with comparison of planned vs. actual <br />schedules, and action items for CONSULTANT and COUNTY staff. Progress reports shall <br />accompany the invoices submitted to the COUNTY each month. <br />• Develop site-specific safety plan. <br />• Coordinate SUBCONTRACTOR agreements, safety plans, and quality management plans. <br />• Manage SUBCONTRACTOR scope, schedule, and budget. <br />Task 1 Assumptions, Workshops, and Deliverables <br />Assumptions. <br />• CONSULTANT will contract directly with SUBCONTRACTOR for rental and operation of heavy <br />equipment and maintenance of traffic (MOT). <br />Meetings/Workshops: <br />• Eight (8) 1 -hour virtual biweekly progress meetings. <br />Deliverables., <br />• Monthly invoices with progress reports <br />Task 2 — Condition Assessment Sequence of Work Plan <br />CONSULTANT will develop a Sequence of Work Plan which describes the sequence of work to be <br />performed, equipment to be used, project staffing, key contacts, schedule of bridge segments to be <br />assessed each day, numbering of pipes and pipe appurtenances, and condition assessment forms. <br />CONSULTANT will incorporate relevant COUNTY standards into the Sequence of Work Plan. <br />CONSULTANT will maintain a comment log to record COUNTY comments on Sequence of Work <br />Plan. <br />Task 2 Assumptions, Workshops, and Deliverables <br />Assumptions. <br />• Schedule assumes a review period of one (1) week for Draft Sequence of Work Plan. <br />Meetings/Workshops <br />
The URL can be used to link to this page
Your browser does not support the video tag.