My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-183A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-183A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 12:56:31 PM
Creation date
10/6/2025 12:50:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/09/2025
Control Number
2025-183A
Agenda Item Number
13.L.2.
Entity Name
HDR Engineering, Inc.
Subject
Amendment 1 to Agreement for Integrated Water Master Plan for Scope of Services for
Wabasso Bridge Reuse Main Condition Assessment , RFQ 2024039
Project Number
IRCDUS 31.24.509
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• One (1) 1 -hour virtual Sequence of Work Plan Review meeting with COUNTY, CONSULTANT, <br />and SUBCONTRACTOR. <br />• Up to two (2) 1 -hour virtual coordination meetings with COUNTY to discuss site access, <br />preparation, and as -needed coordination with downstream customers. <br />Deliverables: <br />• Draft and Final Sequence of Work Plan <br />• Review Comment Log <br />Task 3 — Condition Assessment Permitting <br />CONSULTANT will apply for the following permits/authorizations: <br />• FDOT General Use Permit <br />• FDOT District 4 Lane Closure Submittal Form <br />CONSULTANT will coordinate with FDOT to confirm that proposed work within FDOT right-of-way is <br />compliant with FDOT standards. <br />Task 3 Assumptions, Workshops, and Deliverables <br />Assumptions: <br />• Schedule assumes 60 days for approval of General Use Permit application. CONSULTANT <br />will not be held responsible for schedule impacts due to FDOT review delays. <br />• Schedule assumes 15 days for approval of Lane Closure Submittal Form. CONSULTANT will <br />not be held responsible for schedule impacts due to FDOT review delays. <br />• Permit fees to be reimbursed by COUNTY. <br />• This permitting does not include permitting for repair, rehabilitation, and/or replacement work <br />in Phase II of this scope. <br />Meetings/Workshops: <br />Up to three (3) 1 -hour virtual coordination meetings with COUNTY and/or FDOT to discuss <br />permit application requirements and comments. <br />Deliverables: <br />• General Use Permit Application <br />• Lane Closure Submittal Form <br />Task 4 — Condition Assessment <br />From a boom truck on the bridge, CONSULTANT will perform a condition assessment of the 12 -inch <br />diameter reuse water mains along the lengths of Bridges 1, 2, 3, and 4 of the Wabasso Bridge. <br />CONSULTANT will observe the condition of pipe coating, joints, anchors, and other appurtenances. <br />CONSULTANT will record observations and photos of the mains and will indicate the bridge, main, <br />and location along the main to which the observations and photos refer. CONSULTANT will also take <br />up to twelve (12) wall thickness measurements up to 2.5 feet each in length along Bridges 1, 2, 3, and <br />4 with a Broadband Electromagnetic inspection tool to support assessment of pipe classification and <br />pipe wall condition. CONSULTANT will send an email to COUNTY each day following field work to <br />provide an update on progress, noteworthy observations, and next -day's plan. <br />Field work will be performed in three (3) 1 -week mobilizations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.