My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-183A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-183A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 12:56:31 PM
Creation date
10/6/2025 12:50:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/09/2025
Control Number
2025-183A
Agenda Item Number
13.L.2.
Entity Name
HDR Engineering, Inc.
Subject
Amendment 1 to Agreement for Integrated Water Master Plan for Scope of Services for
Wabasso Bridge Reuse Main Condition Assessment , RFQ 2024039
Project Number
IRCDUS 31.24.509
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 Assumptions, Workshops, and Deliverables <br />• CONSULTANT will inspect reuse mains along Bridges 1, 2, 3, and 4. <br />• Two (2) mobilizations and demobilizations are assumed. <br />• Work will be performed within FDOT District 4's allowed daytime hours for lane closures: <br />o Monday through Friday from 9:00 AM to 4:00 PM <br />• CONSULTANT will perform visual inspection on pipes, supports, and joints to the degree that <br />these are observable with a reasonable effort from the truck bucket. CONSULTANT will note <br />any areas of the pipe or appurtenances that could not be observed. <br />• Where there are pipe configuration constraints, BEM tool will perform partial scans along the <br />circumference of the pipe. CONSULTANT will note any areas of the pipe that could not be fully <br />scanned. <br />Meetings/Workshops <br />• Fifteen (15) in-person safety and site coordination meetings (i.e., one each morning while field <br />assessment is being performed). <br />Deliverables: <br />• Daily email updates including inspection length each day, noteworthy findings, and anticipated <br />next -day's plan. <br />Task 5 — Condition Assessment Report <br />CONSULTANT will compile observations and findings into a Draft Condition Assessment Report. <br />Report will highlight components of the mains (e.g., anchors, coating, joints) in need of rehabilitation <br />as well as areas of concern along the lengths of the mains and pipe classification. Observations will <br />be incorporated into an appendix. <br />CONSULTANT will facilitate one (1) 2 -hour virtual meeting to discuss the findings of the visual and <br />electromagnetics inspections, review the Draft Report contents, and discuss recommended <br />adjustments or considerations regarding path forward for pipeline component repair, rehabilitation, <br />and/or replacement. CONSULTANT will develop meeting materials including presentation, agenda, <br />and meeting notes. CONSULTANT will submit a Final Condition Assessment Report. <br />Task 5 Assumptions, Workshops, and Deliverables <br />Assumphons. <br />• Schedule assumes a review period of two (2) weeks for Draft Condition Assessment Report. <br />Meetings/Workshops <br />• One (1) 2 -hour virtual Condition Assessment Results Discussion Meeting <br />Deliverables: <br />• Draft and Final Condition Assessment Reports <br />• Condition Assessment Results Discussion Meeting presentation, agenda, and notes <br />
The URL can be used to link to this page
Your browser does not support the video tag.