My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-183A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-183A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 12:56:31 PM
Creation date
10/6/2025 12:50:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/09/2025
Control Number
2025-183A
Agenda Item Number
13.L.2.
Entity Name
HDR Engineering, Inc.
Subject
Amendment 1 to Agreement for Integrated Water Master Plan for Scope of Services for
Wabasso Bridge Reuse Main Condition Assessment , RFQ 2024039
Project Number
IRCDUS 31.24.509
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule <br />Table 1: Project Schedule from Notice to Proceed (NTP). <br />Task Name <br />1 - Project Management <br />2 — Condition Assessment Sequence of Work Plan <br />3 — Condition Assessment Permitting <br />4 — Condition Assessment <br />5 - Condition Assessment Report <br />General Assumptions <br />Start <br />Duration <br />(days from <br />(days) <br />NTP) <br />NTP <br />130 <br />NTP <br />30 <br />30 <br />60 <br />90 <br />15 <br />105 <br />30 <br />• Schedule and budget assume no major weather delays. <br />• CONSULTANT will identify which pipe supports and joints are in need of repair or replacement <br />and which sections of pipe require recoating in the Condition Assessment Report. <br />• COUNTY will operate valves needed to remove the reuse mains from service, if needed. <br />• COUNTY will be responsible for coordination with downstream reuse customers for temporary <br />loss of service, if needed. <br />Compensation <br />For Tasks 1 through 5, the COUNTY shall compensate the CONSULTANT for time and materials not <br />to exceed $409,077.72. <br />Professional services for Tasks 1 through 5 will be invoiced monthly by total hours billed. A progress <br />report summarizing work completed by task will be submitted with each invoice. See Exhibit A for fee <br />breakdown. <br />Project Team <br />CONSULTANT's key team members include the following: <br />• Principal -in -Charge — David O'Connor <br />• Project Manager — Carlee Fullenkamp <br />• Pipeline Rehabilitation Specialist — Sonia Oton <br />• Pipeline Condition Assessment Specialist — Susan Donnally <br />• Structural Bridge Engineer — Charles Swanson <br />• Pipe Inspector — Rodger Insignares <br />• Pipe Support Inspector — Charles Compton <br />SUBCONTRACTOR: <br />• Truck Operation/MOT — Sunshine Underbridge <br />• Non -Destructive Wall Thickness Testing — Rock Solid Group <br />• Third -Party Inspection Report Review — Freese & Nichols <br />
The URL can be used to link to this page
Your browser does not support the video tag.