My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-183A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-183A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 12:56:31 PM
Creation date
10/6/2025 12:50:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/09/2025
Control Number
2025-183A
Agenda Item Number
13.L.2.
Entity Name
HDR Engineering, Inc.
Subject
Amendment 1 to Agreement for Integrated Water Master Plan for Scope of Services for
Wabasso Bridge Reuse Main Condition Assessment , RFQ 2024039
Project Number
IRCDUS 31.24.509
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Indian River County Utilities <br />Wabasso 12" Reclaim Main Condition Assessment <br />Estimated Level of Effort and Fee <br />No. <br />Description <br />LEVEL OF EFF <br />�a Pipeline Pipeline CA <br />Project Rehab Specialist I Structural Pipeli <br />Principal Manager Specialist OC Engineer Inspects <br />$381 $169 $360 $375 $360 $,ad=+ <br />pl <br />ppi rt Project <br />pector Engineer Accountant <br />$150 $147 <br />Project <br />Coordinator Total Labor <br />$143 $116 <br />Labor <br />FEE <br />Subcontractor Direct Costs Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.