My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-208
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:55:51 PM
Creation date
10/21/2025 2:55:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/23/2025
Control Number
2025-208
Agenda Item Number
9.X.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Engineering Services Work Order 21 for the Wabasso Repump Station Conversion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&W#256619 <br />Vendors <br />Field Investigations <br />We will visit the site at least twice during the PDF and design phase. <br />Engineering <br />Verifying Power Source and major equipment locations <br />Observe Existing Conditions <br />Size Generator for new and existing loads <br />Size of Electrical service and Electrical equipment based on new <br />Loads and existing loads. <br />Fault current calculations <br />Voltage drop calculations <br />Provide energy calculations for HVAC areas <br />HVAC equipment design and details <br />HVAC Ducts, and HVAC controls <br />Drawings <br />Electrical Site Plans <br />Site plan may include site lighting (photometrics - if required) <br />Electrical Building Plan <br />Grounding and Lightning Protection Plan <br />Lighting and receptacle plans <br />Electrical room plan <br />Equipment room plan <br />HVAC Mechanical plan(s) <br />HVAC Mechanical details <br />Pump Station Electrical Equipment Plan <br />One Line Power Diagram <br />Instrumentation Diagrams <br />Electrical Details as may be required <br />Instrumentation Details as may be required <br />Typical Mechanical Specifications <br />Typical Electrical Specifications <br />Provide documents for Permitting and for Bidding. <br />Provide assistance during bidding phase, <br />Attend a Pre -Bid meeting <br />Respond to Bidder questions <br />Provide Addendum(s) (if needed) <br />Provide review and recommendations of Bids <br />
The URL can be used to link to this page
Your browser does not support the video tag.